Enhance commissioning
NC-2009 EAc3:Enhanced Commissioningposted by Mamdooh Amin on
Do we have to include the contract document between the owner and the CxA?
WHAT IS DIFFERENCE NFRC 100 AND NFRC 200
NC-2009 EAp2:Minimum Energy Performanceposted by Ramkrishna Kashyap on
ONLY NON-RESIDENCE ALUMINUM FRAME
Applicability within campus boundary limits
NC-v4 SSp1:Construction activity pollution preventionposted by Samer Alhmdan on
Hello, I have multiple buildings within a campus, do we need to implement this prerequisite within the whole campus boundaries, or only within buildings LEED boundaries, noting that there are some
SSc7.2 roof gravel
CS-2009 SSc7.2:Heat Island Effect—Roofposted by S Nagarajan on
Dear Sir In a C&S LEED building, can we use coating over an existing gravel and if so whether the credit requirements will be fulfilled
Ceramic Wall base
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Neetika Parmar on
Does ceramic wall base have to be certified under Floorscore or does it automatically qualify similar to mineral based flooring tile ??
Clarification on Solar Hot Water system eligibility
NC-2009 EAc2:On-Site Renewable Energyposted by Sasha Peters on
Please confirm if solar hot water system is eligible for EA credit 2 - On-Site Renewable Energy compliance considering that it is only used for water heating and not generating energy directly.
LEED Development Density and community connectivity
NC-2009 SSc2:Development Density and Community Connectivityposted by Sherrin Pulickal on
What does it mean by double the project density compared with average density within a calculated area? Its the ememplary performance in option 1.
LEED Group C&S - Applicable Cooling source in Propose case
CS-v4 EAp2:Minimum energy performanceposted by Ashraf Ali Khan Khan on
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.
EAc 5.1 for LEED C&S
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by S Nagarajan on
Dear Sir I am involved in a 5-storey building. The base building loads are mixed loads, i.e the loads include lighting and small power.