Forum quick links
Can I omit the IP credit since it is stand alone?
NC-v4 IPc1:Integrative processposted by wachira sosaeng on
Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.
Certify some of multiple fitout floor
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by sompoche sirichote on
Our client will rent 8,10-20 floor within 20 stories building. They would like to get LEED CI certify only for 8 and 10 floor. Can it be done under single project certification?
Floor joists part of interior?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by John Covello on
Hello, Are floor joists considered part of the building interior? So artificial wood used in the joists cannot have urea formaldehyde?
Preferred Parking both inside and outside LEED boundary
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by sompoche sirichote on
Our project is factory expansion and our client purchase a new land nearby for parking facilities. The local zoning require 110 parking lot so we provide 104 parking lots on a new land outside LEED
Can I select my building as "Healthcare" in Portfolio Manager?
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Amornchai Challcharoenwattana on
My building is a licensed hospital and we are trying to be certified in the category of LEED Existing Building O&M as Healthcare option is not available in LEED V.3.
LEED EBOM EA c.4
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Fabio Frescia on
Hello, I have a LEED EBOM project in Thailand. I am now dealing with EA c.4 - On site or Off site Renewable Energy.
Acceptable thermal conditions in naturally conditioned spaces
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Panupant Phapant on
There is a cafeteria where the HVAC designer of record intends to have it naturally conditioned.
Elevated buggy paths qand bridges for resort projecct
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by John Covello on
Hello, I am dealing with a hotel project that will have elevated buggy paths connected to buildings for a second and third tier of buildings.
LEED CI 2009 _ MR Cr1.1_Tenant Space- Long Term Commitment
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Kusha Dogra Sehgal on
I am currently working on LEED CI 2009 project.
Duct sealing methods
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by John Covello on
Hello, Can alternative methods for duct sealing be used besides plastic wrap? One of our contractors is proposing using foam to seal the end of the duct openings.