Ice machines
NC-v4 WEc4:Water meteringposted by John Covello on
Hello. Are Ice Machines considered process water for the purposes of this credit? If they are connected to a freezer does that count?
LPD for manufacturing space
NC-2009 EAp2:Minimum energy performanceposted by Panupant Phapant on
Hi everyone, The project is cosmetic and medicine manufacturing with office. My question is, What difference between detailed manufacturing and Low/High Bay in ASHRAE90.1-2007 table 9.6.1?
Alternative HVAC duct sealant
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by John Covello on
Hi, My contractor is proposing and alternative method to sealing the air conditioning ducts. They would like to use a foam for the duct end that would be air tight.
Motorbike, motocycle & Scooter parking count towards SS CR 4.4?
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by John Covello on
Hello everyone, I see in earlier posts that it is unclear if motorbike, scooters & motorcycles parking counts towards this credit's total or not.
Project size extended in the middle of construction
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by wachira sosaeng on
My project registered for LEED 2009, mixed use building with 2 towers on the same podium.
100% outdoor air indirect evaporative cooling system
NC-2009 EAp2:Minimum energy performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
Actual Operation of Carpool parking
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Jatuwat Varodompun on
We have a restaurant apply for LEED NC retail, We have the carpool parkings for both customers abd staffs.
Zone adjust in residential project
CS-2009 EAp2:Minimum energy performanceposted by Panupant Phapant on
We have an apartment building project. In 1 dwelling unit has 1 bedroom 1 living unit and restroom. Do I need to separate between bedroom and living quarter ?
Heat gain originating from hooded equipment in energy modeling
NC-2009 EAp2:Minimum energy performanceposted by Panupant Phapant on
I am doing energy simulations for a factory.
Project size extended in the middle of construction
NC-v4 MPR3:Must comply with project size requirementsposted by wachira sosaeng on
My project registered for LEED 2009, mixed use building with 2 towers on the same podium.