NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
As per Table 6.8.1D, I observed the following EER = 12.3-(0.213*Cap/1000) EER Also, Cap means the rated cooling capacity of the product in Btu/hr.
Concrete as Temp barriers
NC-2009 MRc2:Construction Waste Managementposted by Ahmad Gabir on
Hi , We are working on Mega project is Saudi Arabia where we are using the concrete waste to build Safety road/excavation barriers which will be used on site during construction instead of purchasi
SSp1 and EPA in KSA
NC-2009 SSp1:Construction Activity Pollution Preventionposted by FABIO VIERO on
We are working on two projects located in Saudi Arabia under LEED 2009 certification. We are looking for finding the appropriate measures to be applied, as per EPA’s Construction General Permit an
Core and Shell Scope & Tenant Scope
CS-2009 MRc5:Regional Materialsposted by Osama Hassan on
Hi, Project is registered on Core & Shell rating System CS V2.0. When i was working on Regional Material Credit MRc5, I found two Options.
Infill Site
ND-Plan-v4 SLLp1:Smart locationposted by Jos Schild on
Is there a definition of an 'infill site'?
LEED Preferred Parking
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Saud Abdul Rasheed on
Hi all, We have received our Final Design Review and the credit has been denied. Now we want to appeal for the credit as the client is willing to provide Low Emitting and Fuel Efficient Vehicles.
refrigerant reccovery
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Faisal on
in EAp3 it says that there should be an EPA approved refrigerant recovery technician, is this requirement also for temporary units(like site offices site warehouse etc) or it is only for permanentl
Proposed case cooling capacity reducing energy savings
NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
Hi, I am doing energy simulation for G+4 Labor Accommodation building. In base case, i have considered 2.66 COP.
LEFEV Parking spots in shared garage w/ no dedicated spaces
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by ELIZABETH REITER on
Regarding Option 1 of providing preferred parking for LEFEV for 5% of the total vehicle parking capacity of the site. Here is our issue/question.
water cooled chillers
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
Hi Marcus, I am working on a project in KSA of about 404330ft2.