Ashrae 90.1 2010 Appendix G
NC-v4 EAp2:Minimum energy performanceposted by junaid naseer on
Do we need to follow addendums of ASHRAE 90.1 2010 in relation to Appendix G for compliance? For instance, addendum F restricts window to wall ratio to 34% for hotel/motel with rooms greater than
Exterior lighting for group certification
NC-2009 SSc8:Light Pollution Reductionposted by Mohamed M. Abd Elhameed on
I am currently working on a project with multiple buildings within the LEED boundary. The project will follow group approach registration via campus guidance.
Inspection Reports - responsible party
NC-2009 SSp1:Construction Activity Pollution Preventionposted by komal kotwal on
Is it required that the on-site inspection be conducted by a third party or can a Contractor's representative conduct the same?
Estimating the energy cost share of PV
NC-2009 EAc2:On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on
I am working on an industrial LEED project in KSA.
Narrative for Option 2 Contractor confimration
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Saud Abdul Rasheed on
Hi all, We are not going to provide photos for this credit but we have an IAQ plan developed and the contractor has been following it according to the credit requirement.
water cooled chilller
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
Hi Marcus The building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice sto
modeling with air cooled chiller
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
the building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice storage + dive
smoke leakage test for duct
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Abdulla Anwar on
Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test, prior to final air leakage test since the project specs is giving a small allowable 1% from basis of des
Gypsum board recycling resource, Saudi Arabia
NC-2009 MRc2:Construction Waste Managementposted by Shreepad Bandagi on
Wondering if anyone would have a resource for gypsum board recycling anywhere in Saudi Arabia. Thanks!
CxA role
NC-2009 EAc3:Enhanced Commissioningposted by Abdulla Anwar on
Can you advise the CxA role if it was a part of Owner organization? .......................... by the way what is the commissioning developed plan CxP?