Wall Putty VOC content measured in gram/kg
CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Kavita Gusain on
The test certificate for VOC content received from Laboratory for wall putty is in grams/kg, whereas LEED specifies the limit in grams/liter.
Group approach
posted by Subramaniam Chandrasekaran on
we are looking into one campus with four buildings plus a food court; intend to register under CS; there is one virtual boundary for the whole campus; all four buildings are coming up together; sin
Doctor Room
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Dinesh V on
What is the Category of Doctor Room as per ASHRAE 62.1.2007 Space classifications ?
Purchasing- Ongoing
EBOM-v4 MRc1:Purchasing - ongoingposted by VISHESH AGARWAL on
what percentage of documentation should be required in local food material (100 miles).
Compliance path for demonstrating minimum daily transit trip
CI-v4 LTc3:Access to quality transitposted by Dipti Talwar on
I am working on a project located in India.
VAV boxes
CS-2009 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.
EA Cr 1.5
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by balasubramaniam kg on
We have a retail commercial project in a leed certified building that is an air port. we want to know for the UA calculation only requires to use the project areas or all the building areas.
Ongoing purchasing and waste policy
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by VISHESH AGARWAL on
Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.
Furniture heights
CI-v4 EQc8:Quality viewsposted by Subramaniam Chandrasekaran on
exactly same as the below mentioned point; for a project, the interior designer wants to know whether they have to go with 1050 mm or 1100 mm of workstation height; this clarification answers; but
District Co generation Plantby
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by satheesh M on
Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.