Water Consumption Outside LEED Boundary

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Aswin M  on 

We have a garment factory project that has a Main block and two toilet blocks (separately for Men & Women).

8
Default Avatar
Conserve Consultants Private Limited
LEEDuser Basic Member
5 thumbs up
Mon Jan 4, 2016, 4:52 am

Single Building Certification_LEED New Construction 2009

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Aswin M  on 

We have a Garment factory project that has three blocks with connectivity bridge.  The three blocks are namely Cutting block, Sewing block, and Fabric store block.

7
Default Avatar
Conserve Consultants Private Limited
LEEDuser Basic Member
5 thumbs up
Wed Dec 30, 2015, 5:06 am

Airconditioning for process requirement

NC-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

Hi, We are working on a tablet manufacturing facility which is fully air conditioned (Only cooling, no heating requirement).

3
Tue Nov 3, 2015, 2:21 pm

CO2 SENSOR IN AN UNDERGROUND METRO STATION.

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  VEL MUTHU  on 

Hello everyone, I am working in a underground metro station which is aiming for LEED certification.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Sep 15, 2015, 2:37 pm

Minimum Ventilation rates for Production area

NC-2009 IEQp1:Minimum IAQ Performance
posted by  sriram tetali  on 

Hi all Can u suggest the Ventilation rates for the Production / manufacturing areas for a Pharmaceutical clients because ASHRAE doesn't mention any for the Production in the Table 6-1

3
Manager -Sustainability Services
M W Group
LEEDuser Basic Member
1 thumbs up
Fri Mar 27, 2015, 7:01 am

How to prove compliance with Mechanical Ventilation

NC-2009 EAp2:Minimum Energy Performance
posted by  Praveenbabu Rajkumar  on 

The project is a medium sized workshop shed and will be mechanically ventilated with fans with a particular air change per hour as per the local standards.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Dec 23, 2014, 6:26 am

Basement Ventilation exceptional calculations

NC-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

Our project has 4 basements with fresh air, exhaust and circulation fans.

4
Fri Nov 21, 2014, 2:47 pm

Selection of HVAC Baseline System

NC-2009 EAp2:Minimum Energy Performance
posted by  Praveenbabu Rajkumar  on 

Hi, Sorry for my English Any one can suggest, which is correct baseline HVAC system for following project description. No.

4
Sun Nov 2, 2014, 11:29 pm