pursuing thermal confort in a museum/gallery

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Angel Vega  on 

Our team is pursuing this credit for a museum/art galleries building. I´ve been checking the IAQ matrix and if I am strict, we should forget this credit.

1
Mon Aug 28, 2017, 6:45 pm

Alarms with CO2 sensors

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Instra Ingenieros  on 

hi, We have a project with non-densely spaces. The non-densely space will have CO2 sensor. VAV with 100% outdoor air will be supply the OA to these spaces.

1
Mon Aug 7, 2017, 3:17 pm

Faucet in cleaning room

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  VICTOR MORENO  on 

Should I include the faucets placed in a cleaning room? It are used for cleaning of the building. Thanks

1
Thu Mar 31, 2016, 11:50 am

Aerothermal Energy

NC-v4 EAc5:Renewable energy production
posted by  Helena Garcia   on 

We're designing a system based on renewable energy installation for new construction. A part of this installation would performed by aerotermal energy.

1
Fri Jul 1, 2016, 1:49 pm

Indoor Water Use Reduction_Well water

CS-v4 WEc2:Indoor water use reduction
posted by  Giuseppina Amorusi  on 

Hi everybody, I was envolved in LEED v4 C&S certification. I would know if in Credit Indoor Water Use Reduction it’s possible to consider well water accumulated in water tank as alternative wat

1
Fri Jan 13, 2023, 5:56 pm

Option 1: Zoning and controls

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Ricardo Sá  on 

Hi, The project is basically a huge sales area with some office spaces.The sales area is served by multiple compact rooftop units and the office areas are served by DOA´s for ventilation purposes

1
Tue Mar 21, 2017, 3:09 pm

Policy goals

EBOM-2009 MRp1:Sustainable Purchasing Policy
posted by  Charalampos Giannikopoulos  on 

Does a specific goal need to be addressed for the policy or would a prescriptive description of the goal be used such as that “the goal is to, at a minimum, maintain the current environmentally pre

1
Mon Jun 29, 2015, 8:39 pm

Existing Equipment

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

The 90.1-2010 User's Manual states: "In some cases, a complete HVAC system already exists (...) the proposed building and baseline building models are the same and are based on the existing HVAC sy

1
Wed May 10, 2017, 1:26 pm

EAP2_Humidification Modeling

CS-v4 EAp2:Minimum energy performance
posted by  Giuseppina Amorusi  on 

Hi all, I need to model water humidification section of air handling unit. The software I was using is Design Builder + Energy Plus, that don't have the possibility to insert a water humidifier.

1
Fri Jun 30, 2017, 1:53 pm

electric transformer

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

In the building there is an electric transformer that transforms the electricity coming from the grid into low voltage energy. The transformer is particularly efficient.

1
Tue Feb 9, 2016, 3:47 pm