Forum quick links
Core & Shell without HVAC or electrical systems
CS-2009 MPR2:Must be a complete, permanent building or spaceposted by Celia Puertas Romero on
We would like to pursue LEED Core & Shell certification for a building undergoing a major renovation.
Continuous Monitoring Sensors
EBOM-v4 EQc3:Thermal comfortposted by Laura Danzig on
Hi there, a quick question regarding the locations of the sensors/measurements required for this credit.
Error in eQUEST in the Perform Compliance Analysis
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
Dear all, I am stuck with an error from eQUEST.
Integrative Process-Simple box C&S v4
CS-v4 IPc1:Integrative processposted by Giuseppina Amorusi on
Hi all, I and my team are working on LEED v4 BD+C project, and we're looking to pursue the Integrative Process credit for Core and Shell certification. We have an existing building where we will do
Building area to site area ratio
CS-2009 PIf2:Project Summary Detailsposted by Giuseppina Amorusi on
Hi, I am doing an office tower (19 stories above grade).
Standing human activity
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by VICTOR MORENO on
Hello, I am working in a Museum project.
residential/nonresidential
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Exception a. of G3.1.1 states: "Use additional system type(s) for non predominant conditions (i.e. residential/nonresidential …)".
Baseline Ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
Dear all, our previous version of the baseline model in a C&S building had the same ventilation rates than the proposed.
Reuse of existing building materials in the building parking lot
NC-v4 MRc1:Building life-cycle impact reductionposted by Greenlab on
Hi. In option 3 of this credit “Building and Material Reuse” we must reuse or salvage building materials from off site or on site as a percentage of the surface area.
No Facility Alterations
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Charalampos Giannikopoulos on
Would a project with no facility alterations or additions during the performance period and as result with no relevant waste be still eligible for this credit?