Humidification in system 7
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
The design model has an AHU that supplies air for some zones. During the winter season the AHU humidifies the air through an atomising humidifier.
Water metering for Fire safety
Retail-NC-v4 WEc4:Water meteringposted by ilenia ottati on
Does water meter for fire emergency counts as additional meter for process water? In our project a tank is filled with water coming from municipal facility.
Building Area Method - highlighting merchandise
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
For a building I have to use the Building Area Method (ASHRAE 90.1-2007, 9.5.1) because some calculations were already developed through that method and now changing the method would be complicated
Recycled cork can contribute to achieve MRc6?
NC-2009 MRc6:Rapidly Renewable Materialsposted by Ricardo Sá on
We're working in a project that use a thermal coating based on cork material. This cork is 100% recycled. Can this material contribute to achieve both credits (MRc4 +MRc6)?
tools
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Emmanuel Pauwels on
Is one click LCA an accepted tool to demonstrate compliance with this credit?
RECs for Europe
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Charalampos Giannikopoulos on
Could you advise of a list of REC vendors who could provide offsite renewable energy for a project located in Europe (Greece)?
District heating with renewable energy. Baseline?
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I'm modeling a district heating system according to option 2 of “Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction”.
Glisofat
EBOM-v4 SSc5:Site managementposted by Emmanuel Pauwels on
There are contradictory studies related to the use of glisofat as a herbicide. Would spraying with a mixture containing 30% glifosat be an aceptable practice?
Zero lot project
Pilot-Credits PC14:Walkable Streetsposted by Belén Valladares López on
We are working in a zero lot line project. It's possible to consider this credit as there is no interior siewalks? Thanks
consumption and demand
NC-v4 EAc3:Advanced energy meteringposted by Francesco Passerini on
Does "Electricity meters must record both consumption and demand" mean that both kWh and instantaneous kW must be recorded?