Forum quick links
Take credit for variable temperature setpoints in hotel rooms
NC-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
We have a hotel project where heating setpoints in hotel guest rooms are 21 degrees Celsius when the room is occupied and lowered to 18 degrees Celsius when the guests are not in the room.
No test of SRI?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Lise Dannesboe on
Hi! We are using new light grey concrete and new light grey concrete stones on our site. LEED provides typical SRI values, f.ex.
Cleaners
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Pia Öhrling on
Should a cleaner used before the adhesive (to make the Surface clean) fullfill IEQc4.1? If it should which category should be used?
Footprint, at grade or below grade?
NC-2009 PIf2:Project Summary Detailsposted by Maria Porter on
Hi! I have a question similar to the one posted on Nov 18 2013 below.
When can construction review start for a NC project
posted by Pia Öhrling on
How much of the building must be ready before you can send in constuction review?
Definition of greenfield site
NC-2009 SSc2:Development Density and Community Connectivityposted by Maria Glädt on
Hi! We have a site in Nairobi which we try to define as a greenfield or previously developed site.
Open Office Landscape and System Furniture
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Raina Tilden on
Hi everyone, I have read ever post on this forum twice now, and I am still confused!
LEED 2009 CI Preliminary Combined Review
CI-2009 IEQp1:Minimum IAQ Performanceposted by Aparna Maladkar on
Hello, I am new to LEED and need some assistance before issuing for preliminary combined review. I have completed all the required project and pre-requisites forms.
Submeters to measure AND RECORD energy use
CI-2009 EAc3:Measurement and Verificationposted by Michael Smithing on
In our project the tenant pays a lump sum for thermal energy use, but pays for electricity based on actual consumption. We therefore cannot achieve the 3 points.
Where do I enter residential units in form?
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Maria Porter on
My project is a nursing home with some workstations for staff. In the form (v 4.0) on LEED Online there is nowhere to fill out what lighting controls the residents have.