Percentage of Light Output/Wattage Dimmed

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Jordan Kirrane  on 

Hi there, For the daylight control point I was wondering by how much the group of lights need to be reduced by, and whether this percentage needs to be of the total wattage or light output?

5
Default Avatar
Associate
Hurley Palmer Flatt
LEEDuser Basic Member
5 thumbs up
Wed Mar 23, 2016, 3:23 pm

Determination of 2 year energy consumption

NC-2009 EAc6:Green power
posted by  Jordan Kirrane  on 

Hi there, My project wishes to calculate the GWh of green power required for compliance via the company's standard calculation procedure.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Mar 21, 2016, 4:51 pm

Perimeter protection

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Martin Meehan  on 

We have a number of LEED projects in infill locations in Ireland. Since we don't really have a standard code for site Erosion and Sedimentation we have to stick to the U.S.

3
Default Avatar
Principal
Meehan Associates
LEEDuser Basic Member
14 thumbs up
Thu Feb 11, 2016, 6:22 pm

Top level parking_Option 1

NC-v4 SSc5:Heat island reduction
posted by  Rasita Masalskyte  on 

Hello, We're pursuing Option 1. Nonroof and roof. Questions: 1. Is a top level of multi storey parking garage exempt from Option 1 calculations if it has parking spaces?

3
Wed Jan 27, 2016, 3:38 pm

What is legally binding language?

CS-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Pawel Krawczyk  on 

A copy of the lease agreement that has been provided for review states that the tenants must install CO2 sensors in all densely occupied spaces. For the review team, it is unclear how the provided

3
Thu Jan 21, 2016, 1:12 am

LEED Online terminology

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Susannah Goddard  on 

Possibly a bit of a rookie question but... The scorecard page has a drop down which denotes the status of the credit.

7
Sustainability/Energy Engineer, CEM, PMP, LEED AP BD+C, LEED AP O+M, Estidama PQP
LEEDuser Basic Member
10 thumbs up
Tue Dec 22, 2015, 12:19 pm

Manually Watering instead of Temporary Irrigation?

NC-2009 WEc1:Water Efficient Landscaping
posted by  Patrice McVeigh  on 

Hi All, For a water efficient landscape, with native plants and no requirements for irrigation except a temporary irrigation system for 12 or 18 months. Can a person within the maintenance team o

3
Fri Nov 27, 2015, 7:24 pm

Is EMICODE EV1 ceetification LEED compliant?

NC-v4 EQc2:Low emitting materials
posted by  Meike Borchers  on 

Hi, I am working on a project in Sweden where we are using a number of different flooring adhesives.

2
Environmental Engineer
LEEDuser Basic Member
11 thumbs up
Tue Nov 10, 2015, 1:27 pm

WEp1 Credit Resources - Water Use Reduction Calculator

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Susannah Goddard  on 

I have just come across the Water Use Reduction Calculator tool in the credit tools for WEp1. Do most people use this to demonstrate compliance?

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Tue Nov 3, 2015, 4:23 pm

Lavetory Faucet default duration

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Susannah Goddard  on 

I have noticed a discrepency between the default duration shown within the LEED NC 2009 manual WEp1 table 2 and the default duration which auto populates for Private Lavatory Faucet on LEED Online

3