Paints or sealants applied before building is sealed

CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Patrice McVeigh  on 

Hi, If paints /sealants /adhesives are being applied on site but before the building has been enclosed do they still need to comply with the associated VOC limits?

1
Fri Apr 22, 2016, 9:42 pm

Open Space: Fence

NC-v4 SSc3:Open space
posted by  Sophie Brauer  on 

Hello, I'm trying to assess how much of our project site qualifies as open space.

1
Mon May 2, 2016, 3:49 pm

A shared storm water tank with other projects

CS-2009 SSc6.1:Stormwater design - quantity control
posted by  Francesco Allaix  on 

I have a LEED project where they plan a storm water tank that will be a shared one with two other buildings next to the LEED project building.

1
Thu Jan 19, 2017, 5:52 pm

Steel lockers BIFMA testing

CI-2009 IEQc4.5:Low-emitting materials - systems furniture and seating
posted by  Anna Korinkova  on 

We have steel lockers on our project which shall be produced by a steel company and painted in the factory. They claim to use low VOC or zero VOC paints.

1
Tue Oct 18, 2016, 3:52 pm

PPA as renewable energy production?

CS-v4 EAc5:Renewable energy production
posted by  Lai-San wong  on 

Hi! In the requirement for EAc5 (BD+C) it is stated: "The use of solar gardens or community renewable energy systems is allowed if both of the following requirements are met.

1
Mon Aug 28, 2017, 1:41 pm

Switching between Options 1 and 2

CI-v4 EAc2:Optimize energy performance
posted by  Meike Borchers  on 

We have submitted our initial design stage submittal and received commentary on our Option 2 approach - Prescriptive compliance.

0

Discrepancy between credit requirements and credit specifics

Pilot-Credits MRpc52:Material multi-attribute assessment
posted by  Jody Lee Potvin-Jones  on 

I'm having a hard time understanding why it is necessary to document cost, weight and "percentage of product contributing to this criterion", if the requirements are simply to use 20 different pro

1
Wed Apr 13, 2016, 9:14 pm

Option 2 IAQ Testing - Schedule

CI-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Anne-Claire BARBERI  on 

Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.

1
Fri Jun 24, 2016, 9:52 am

Cycle network, paths?

NC-v4 LTc6:Bicycle facilities
posted by  Karen Elliott  on 

Does anyone know if paths used for pedestrians and cyclist count as 'off Street' bicycle network. Thanks!

1
Thu Feb 25, 2016, 11:37 pm

Calculator Points clarification

Pilot-Credits MRpc102:Legal Wood
posted by  Patrice McVeigh  on 

Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2.

0