How to prove compliance with Mechanical Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Praveenbabu Rajkumar on
The project is a medium sized workshop shed and will be mechanically ventilated with fans with a particular air change per hour as per the local standards.
Process load significantly lower than 25%
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
The overall process load of our project turns out to be in the vicinity of 15% only. We are aware that 15% is absurdly low and unusual for plants.
VAV Fan control for baseline system 6
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
We have a rough time seeking to reduce supply fan energy during energy simulations.
Process Load for Manufacturing
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Dear All, I have some question about my project, Our project is a cosmetic factory. Can I assume this project to Light Manufacturing type?
Basement Ventilation exceptional calculations
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
Our project has 4 basements with fresh air, exhaust and circulation fans.
Selection of HVAC Baseline System
NC-2009 EAp2:Minimum Energy Performanceposted by Praveenbabu Rajkumar on
Hi, Sorry for my English Any one can suggest, which is correct baseline HVAC system for following project description. No.
Recycling Facility Letters of Certification
NC-2009 MRc2:Construction Waste Managementposted by John Covello on
I have a question about doing an overseas project. Do we need some kind of Letters of Certification for the recycling facilities we are using?