Forum quick links
Baseline HVAC Model System-8 VAV PFP Boxes with Outdoor Air Unit
NC-2009 EAp2:Minimum energy performanceposted by Ivan Priatman on
Dear LEED, We are designing a medical office with VRF system, to fulfill iaq requirements we add independent outdoor air unit comprises of supply and exhaust fans on each zone.
Minimum Ventilation rates for Production area
NC-2009 IEQp1:Minimum indoor air quality performanceposted by sriram tetali on
Hi all Can u suggest the Ventilation rates for the Production / manufacturing areas for a Pharmaceutical clients because ASHRAE doesn't mention any for the Production in the Table 6-1
HVAC System 8 Baseline
CS-2009 EAp2:Minimum energy performanceposted by CINDY CHAI on
Hi all, Currently I have a project in Malaysia that is going for LEED Core and Shell (2009), the project consists of multiple buildings but will be certified under one certificate.
Ancillary site buildings
NC-2009 SSc7.1:Heat island effect - nonroofposted by Erin Holdenried on
Are unoccupied ancillary site buildings included in the credit? Or SSc7.2? Thanks for your feedback!
Basic Services Provided by the Client
NC-2009 SSc2:Development density and community connectivityposted by Keerthi Ratnayake on
We have purchased an old factory and currently renovating the buildings to accommodate 2,000 workers.
How can I filled the LEED Online form
CS-2009 WEc3:Water use reductionposted by Somsak Jidmon on
My current CS Project using the water saving fixtures and saving the water up to 36% Reduction and our project will used the gray water from waste water treatment plant for all the flush fixtures w
Precision Air Conditioning for Server Room and Art Gallery
NC-2009 EAp2:Minimum energy performanceposted by Panupant Phapant on
Dear All We have two projects that are attempting LEED 2009 NC Certification the first one is office building with server room and the second one is Arg Gallery.
Domestic Hot Water System
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Keerthi Ratnayake on
Is it a mandatory requirement to install a domestic hot water system in a LEED project?
Synthetic Enamel's VOC
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Yodi Danusastro on
Which one from the table that suits for Synthetic Gloss Enamel paint, that use for painting metals?
Envelope materials with no provided u-values
NC-2009 EAp2:Minimum energy performanceposted by John Covello on
Hello, On our project we are getting supplied from local contractors materials like sandstone, granite, reused teak wood, and limestone.