Forum quick links
Energy Modeling using "HAP"
NC-2009 EAp2:Minimum energy performanceposted by Muzamil Rafique on
Hi Marcus Sheffer, i am totally confused please guide me.
Building Flush Out Inquiry
EBOM-2009 IEQc1.5:Indoor air quality best management practices - indoor air quality management for facility additions and alterationsposted by Sheena Moses on
We are currently working on an EBOM Retail project which is undergoing fit out works to the common mall and tenant areas.
Open space definition
NC-2009 SSc5.2:Site development - maximize open spaceposted by sompoche sirichote on
My project is in the industrial area which allows building footprint not exceeding 66% of total site area.
Can I omit the IP credit since it is stand alone?
NC-v4 IPc1:Integrative processposted by wachira sosaeng on
Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.
Heat Island Reduction
EBOM-v4 SSc3:Heat island reductionposted by VISHESH AGARWAL on
Dear All, Can I take option-2: Roof (1 Points) and option-4: Parking Under Cover (1 Points) Simultaneously for achieving 2 points under this category OR we need to use option-3 for targeting the 2
treat wastewater to teriary standards?
NC-2009 WEc3:Water use reductionposted by Erin Holdenried on
I have a project that is pursuing WEc2 via Option 2 treating wastewater to tertiary standards and infiltrating onsite through landscape irrigation. Can this factor into water saving for WEc3??
LEED Boundary
NC-2009 IEQp1:Minimum indoor air quality performanceposted by ABDUL MUTHALIB MOHAMED on
I am working on LEED boundary for Factory building. The factory has two buildings with common car parking but we are applying LEED certification for only building - 1.
Area clarification
CS-2009 EAp2:Minimum energy performanceposted by Magda Aghababyan on
Hi, We have Core & Shell project while calculating the area of the locations, Pif and EAp2 have difference approximately 4% please let us know what is the maximum percentage deviation. Thank y
LOCAL EQUAVALENT - WHERE EIA IS NOT COMMONLY DONE (INDIA)
Healthcare-v2009 SSp2:Environmental site assessmentposted by jesmin joseph on
Dear Sir, We have registered a 200 bed Multispecialty hospital in India under LEED V2009 BD+C Healthcare rating system.
EA Prerequisite 2
CI-2009 EAp2:Minimum energy performanceposted by Poorva Keskar on
In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.