Onsite solar PV generation - 10 years contract
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Ameet AA on
Hi, Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)?
Basic Doubts
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
I have a few basic Doubts regarding what is stated in the reference guide. Please clarify. 1.
Elevated buggy paths qand bridges for resort projecct
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by John Covello on
Hello, I am dealing with a hotel project that will have elevated buggy paths connected to buildings for a second and third tier of buildings.
Natural ventilation for residential
CS-2009 IEQp1:Minimum IAQ Performanceposted by mai elly on
HI, The client requesting to have DX air conditioning system for each space in the building. My questions: 1. Could I use the sliding door as operable wall/window to supply the fresh air? 2.
Required parking lots and LEED boundary Calculations
CS-2009 MPR3:Must use a reasonable site boundaryposted by kerry wang on
Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking
Zone adjust in residential project
CS-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
We have an apartment building project. In 1 dwelling unit has 1 bedroom 1 living unit and restroom. Do I need to separate between bedroom and living quarter ?
Location of OA monitor at PAU or AHUs
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Indochine Engineering VN on
Hi, my project has PAU distributes 100% OA to AHUs so I want to ask if installing 1 OA meter at PAU is sufficient for the credit or I have to install meters at every AHU? Thank you for your advic
Core and Shell - Retail
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
We are working on a retail mall where each tenant retail space is provided with a chilled water tap off.
Single certification for physically distinct structures
NC-v4 MPR2:Must use reasonable LEED boundariesposted by NAMRATA GUPTA on
We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc.
Job Specific Environment Analysis
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Yodi Danusastro on
Does anyone has the template of JSEA? I've been ask to create ESC with inclusion of JSEA template. Where an I find this template?