SSc4.1

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Magda Aghababyan  on 

We have campus project from building entrance to the 1st bus stop near about 520m. Is it possible to apply this credit.

1
Wed Aug 17, 2016, 5:21 pm

Heat Island Reduction

EBOM-v4 SSc3:Heat island reduction
posted by  VISHESH AGARWAL  on 

Dear All, Can I take option-2: Roof (1 Points) and option-4: Parking Under Cover (1 Points) Simultaneously for achieving 2 points under this category OR we need to use option-3 for targeting the 2

0

treat wastewater to teriary standards?

NC-2009 WEc3:Water Use Reduction
posted by  Erin Holdenried  on 

I have a project that is pursuing WEc2 via Option 2 treating wastewater to tertiary standards and infiltrating onsite through landscape irrigation. Can this factor into water saving for WEc3??

1
Fri Nov 27, 2015, 7:33 pm

LEED Boundary

NC-2009 IEQp1:Minimum IAQ Performance
posted by  ABDUL MUTHALIB MOHAMED  on 

I am working on LEED boundary for Factory building. The factory has two buildings with common car parking but we are applying LEED certification for only building - 1.

1
Fri Nov 6, 2015, 1:22 pm

Area clarification

CS-2009 EAp2:Minimum Energy Performance
posted by  Magda Aghababyan  on 

Hi, We have Core & Shell project while calculating the area of the locations, Pif and EAp2 have difference approximately 4% please let us know what is the maximum percentage deviation. Thank y

1
Thu Nov 24, 2016, 8:11 am

LOCAL EQUAVALENT - WHERE EIA IS NOT COMMONLY DONE (INDIA)

Healthcare-v2009 SSp2:Environmental site assessment
posted by  jesmin joseph  on 

Dear Sir, We have registered a 200 bed Multispecialty hospital in India under LEED V2009 BD+C Healthcare rating system.

1
Thu Mar 9, 2017, 11:17 am

EA Prerequisite 2

CI-2009 EAp2:Minimum Energy Performance
posted by  Poorva Keskar  on 

In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.

1
Fri Feb 19, 2016, 4:10 pm

Project size extended in the middle of construction

NC-v4 MPR3:Must comply with project size requirements
posted by  wachira sosaeng  on 

My project registered for LEED 2009, mixed use building with 2 towers on the same podium.

1
Tue May 30, 2017, 5:12 pm

loading bay inside building footprint

NC-2009 PIf2:Project Summary Details
posted by  Melissa Merryweather  on 

Hi, I have a garment factory and the loading bay is actually inside the footprint of the building, taking up about 10% of the ground floor area.

0

Modeling DCV Savings for Proposed Building

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Bernard Sagaiyaraj  on 

To account savings using DCV, we understand that Baseline building ventilation is to be modeled using ASHRAE 62.1 whereas Proposed building ventilation is to modeled as designed. However our Basel

1
Fri Jan 27, 2017, 6:50 pm