Project that only Greenfield Exist
NC-v4 SSc2:Site development - protect or restore habitatposted by Yodi Danusastro on
HI, what if at the project site is only Greenfield?
Tenant agreement to exclude PFP boxes
CS-2009 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
In our project location, it is clear that no tenants will go for a heating system. The base building is also designed for cooling only.
International Project - Case 2 Option 1 or Option 2
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Sheena Moses on
Dear all, We have a retail mall in Malaysia targeting LEED EBOM v2009 rating.
SHGC Value ASHRAE 90.1-2007
NC-2009 EAp2:Minimum energy performanceposted by John Covello on
Hello everyone, Are the maximum SHGC values in ASHRAE 90.1-2007 suggested only? For example on table 5.5-1 there is a max SHGC listed of 0.25.
Vertical Garden/Green wall
CS-2009 WEc1:Water efficient landscapingposted by Carmelito Tatlonghari on
I have a project that is considering installing green wall/vertical garden. We would like to pursue WEc1. Water Efficient Landscaping, Option 2 (No Potable Water Use on Irrigation).
Lighting control in Tenant space
CS-2009 EAp2:Minimum energy performanceposted by Indochine Engineering VN on
Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE.
LEED EBOM EA c.4
EBOM-2009 EAc4:On-site and off-site renewable energyposted by Fabio Frescia on
Hello, I have a LEED EBOM project in Thailand. I am now dealing with EA c.4 - On site or Off site Renewable Energy.
Fan power in conditioned space
NC-2009 EAp2:Minimum energy performanceposted by Panupant Phapant on
Hello, My production line space in our project have an supply fan, exhaust fan and make-up fan to supply OA in conditioned space.
Innovation Credit for Employee Wellness
NC-2009 IDc1:Innovation in designposted by sriram tetali on
Hi, Can anyone has guidelines or suggest for attempting of Innovation in Design credit for Employee Wellness Can it be achieved? or suggest any other alternative. Regards SRIRAM
Confidential space
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Ameet AA on
Hi, The project is a 3-storey high building, single tenant. The tenant already occupies the building, and going to renovate about half of the floor area.