Sat Aug 26, 2017, 6:50 pm

Onsite solar PV generation - 10 years contract

EBOM-v4 EAc7:Renewable energy and carbon offsets
posted by  Ameet AA  on 

Hi, Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)?

1
Tue Jun 27, 2017, 1:17 am

Basic Doubts

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

I have a few basic Doubts regarding what is stated in the reference guide. Please clarify. 1.

1
Tue Apr 19, 2016, 2:57 pm

Elevated buggy paths qand bridges for resort projecct

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  John Covello  on 

Hello, I am dealing with a hotel project that will have elevated buggy paths connected to buildings for a second and third tier of buildings.

1
Mon Jul 17, 2017, 9:10 am
1
Mon Jun 6, 2016, 9:54 pm

Preferred Parking both inside and outside LEED boundary

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  sompoche sirichote  on 

Our project is factory expansion and our client purchase a new land nearby for parking facilities. The local zoning require 110 parking lot so we provide 104 parking lots on a new land outside LEED

1
Sat Aug 26, 2017, 9:46 pm

Datacentre Requirements

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Priyadarsi Das  on 

Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.

1
Wed Feb 11, 2015, 11:34 pm

Outdoor Air Delivery Monitoring - Installation of CO2 sensors

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  SAMY Chamy  on 

1. CO2 sensors are installed in our project, but not interconnected with fresh air fans. CO2 sensors will only monitor the CO2 levels and raise an alert when the levels are increased.

1
Mon Jun 6, 2016, 2:11 pm

Private shuttle buses

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Hanh Truong  on 

Dear all, I would like to use LI ID# 100001163 : "Shuttle buses should provide direct access to transit facilities within 2 miles of the project site, approximately a 5-10 minute drive, and must b

1
Thu Aug 10, 2017, 12:08 pm

Zone adjust in residential project

CS-2009 EAp2:Minimum Energy Performance
posted by  Panupant Phapant  on 

We have an apartment building project. In 1 dwelling unit has 1 bedroom 1 living unit and restroom. Do I need to separate between bedroom and living quarter ?