Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Combine Natural ventilation & trickle ventilation for Apartment

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Thu Nguyen  on 

Dear all experts! I have a high-rise residential building which aim to comply with IEQ pre.1 by combining 2 ways. 1.

1
Thu Mar 31, 2016, 1:25 pm

Water Efficiency Calculation

NC-2009 WEc3:Water Use Reduction
posted by  ABDUL MUTHALIB MOHAMED  on 

Hi, My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used?

1
Mon Mar 2, 2015, 10:59 pm

Historic District

NC-v4 LTc3:High priority site
posted by  Indochine Engineering VN  on 

Hi, my project located in an old district where has a lot of old architecture buildings around with tourist.

1
Tue Jul 18, 2017, 5:14 pm

compliance for naturally ventilated spaces

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Poorva Keskar  on 

Referring to the FAQs fan-assisted ventilation in naturally ventilated spaces can be considered as mechanical ventilation.

1
Thu Aug 31, 2017, 5:37 pm

How to get the benefit of automatic shading control device

NC-2009 EAc1:Optimize Energy Performance
posted by  Yusuf Turab  on 

We are using Visual DOE 4.2 software for energy modeling and we are doing one LEED NC project, the project team is planning to do the automatic sensor control window shading device, and how to take

1
Fri Jul 1, 2016, 2:14 pm

Accidentally Opened Awarded Credit during Appeal Stage

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Bernard Sagaiyaraj  on 

My team member accidentally opened 2 awarded credits during the Appeal Stage for some other non-compliance credits. No changes were made to the form.

1
Tue Aug 25, 2015, 1:06 pm

Option-3: Irrigation Meter Installed

EBOM-v4 WEc1:Outdoor water use reduction
posted by  VISHESH AGARWAL  on 

i am working on the project where project team use the STP Non potable water used for irrigation purpose. so i am reducing the 100% potable water. can i sufficient to achieve this credit.

1
Wed Mar 8, 2017, 11:34 pm

Project located in a building with a very low fresh air rate

Retail-NC-v4 EQp1:Minimum indoor air quality performance
posted by  Valentin Grimaud  on 

What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t

1
Tue Jan 17, 2017, 9:15 pm

WE Credit 4.2: Cooling Tower Water Management- non potable

EBOM-2009 WEc4:Cooling Tower Water Management
posted by  satheesh M  on 

The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.

1
Tue Dec 1, 2015, 4:07 pm