Forum quick links
CI for Hospital;
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Ajay Kumar on
This project has about 4 public bus stops located within 1/4 mile of walking distance from project entrance.
LEED Platinum
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Muzammal Abbas LEED AP (BD+C) on
We had submitted one of our LEED EBOM V4 project final review and received 72 points. We had accepted the review and received Certified Gold Level.
General Emissions Evaluation
NC-v4 EQc2:Low emitting materialsposted by Joshua Chia on
Hi All! Appreciate if someone can help with the following. The reference guide states that for projects overseas, the products can be tested to either CDPH or AgBB.
MIXED MODE Ventilation
CI-2009 IEQp1:Minimum IAQ Performanceposted by Sathish Kumar on
May i know, what are the documents are providing clarity on designing the mixed mode ventilation strategies?
Combine Natural ventilation & trickle ventilation for Apartment
NC-2009 IEQp1:Minimum IAQ Performanceposted by Thu Nguyen on
Dear all experts! I have a high-rise residential building which aim to comply with IEQ pre.1 by combining 2 ways. 1.
Water Efficiency Calculation
NC-2009 WEc3:Water Use Reductionposted by ABDUL MUTHALIB MOHAMED on
Hi, My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used?
Historic District
NC-v4 LTc3:High priority siteposted by Indochine Engineering VN on
Hi, my project located in an old district where has a lot of old architecture buildings around with tourist.
Leeds case study
posted by Rudrabir Ghanti on
Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds certfica
Mixed-use Building
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Wan Ji Loo on
Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.
Energy Submetering
EBOM-v4 EAc5:Advanced energy meteringposted by VISHESH AGARWAL on
I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.