Forum quick links
Bamboo Flooring to be considered in certified wood calculations
NC-2009 MRc7:Certified woodposted by ABDUL MUTHALIB MOHAMED on
We have suggested bamboo flooring in a project for 2000 SFT. Should we include bamboo flooring in Certified wood calculations? Please clarify. Thanks in Advance.
leed ebom- v4: Enhanced indoor air quality strategies
EBOM-2009 IEQc1.2:Indoor air quality best management practices - outdoor air delivery monitoringposted by VISHESH AGARWAL on
Option 2. Additional enhanced IAQ strategies (1 point) Comply with the requirements of at least one of the following. 1. Filtration for mechanically ventilated spaces 2. Carbon Dioxide Monitors 3.
Rainwater Harvesting - Irrigation and Reclaimed Water?
EBOM-v4 WEc4:Water meteringposted by ARDOR GREEN on
We have an office project that will have some large rainwater collection tanks that will be used for irrigation.
Leeds case study
posted by Rudrabir Ghanti on
Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds certfica
Mixed-use Building
CS-2009 SSc9:Tenant design and construction guidelinesposted by Wan Ji Loo on
Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.
Energy Submetering
EBOM-v4 EAc5:Advanced energy meteringposted by VISHESH AGARWAL on
I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.
Lighting Control
EBOM-2009 IEQc2.2:Controllability of systems - lightingposted by VISHESH AGARWAL on
I am working on the project where whole building have occupancy sensor. does need to install 50% of the multi occupant space have lighting control by dimmer.
Exhaust Requirement
NC-2009 IEQp1:Minimum indoor air quality performanceposted by SAMY Chamy on
I think this credit is for fresh air requirement. Is there any requirement for Exhaust rates, are they need to documented for this credit Our project have store rooms as per local Fire and safety
SS - EM
NC-2009 EAc1:Optimize energy performanceposted by SSN Energy Model on
Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.
General Emissions Evaluation
NC-v4 EQc2:Low-emitting materialsposted by Joshua Chia on
Hi All! Appreciate if someone can help with the following. The reference guide states that for projects overseas, the products can be tested to either CDPH or AgBB.