Forum quick links
Minimum Indoor Air Quality Performance Calculation
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Amal Venugopal on
My Project is Having one FAHU on roof which is supplying treated Fresh air to all AHU"s, which further supplying the mixture of outdoor air and Recirculated air to various zone via VAV (no reheatin
DOAS with 2 energy wheel
NC-v4 EAp2:Minimum energy performanceposted by Mohamed Shehata on
How to simulate DOAS with 2 energy wheels in the simulation software
Waste Score
EBOM-v4.1 MRp3:Waste Performanceposted by Maysoon Al-Khuraissat on
Is there a reference or a list showing the waste score for the baseline buildings?
Outdoor Water Use credit - LEED V4.1
NC-v4.1 WEc1:Outdoor Water Use Reductionposted by Maria Farah on
In LEED BD+C: New Construction V4.1, the outdoor water use reduction credit (2 points) states that alternative water sources can be used to achieve an additional 30% reduction.
LEED O+M Campus Chiller Plant
EBOM-v4.1 EAp3:Energy Performanceposted by Rajarajan Sekar on
We are trying to go for LEED O+M certification in one of our buildings which has a Chiller plant in it along with other occupied places
Data Sheet or Laboratory test report?
NC-v4 SSc5:Heat island reductionposted by Samer Alhmdan on
Hello, Do we need a laboratory test report to substantiate the SRI, or the Data Sheet by manufacturer is sufficient ?
Resort: Baseline HVAC
NC-v4 EAc2:Optimize energy performanceposted by Amal Venugopal on
Greetings!...
We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA.
System 2 as the baseline system for the whole project
NC-v4 EAp2:Minimum energy performanceposted by Amal Venugopal on
We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA. Greetings!...
Commingled Waste approach in storage locations for recyclable materials
EBOM-v4.1 MRp3:Waste Performanceposted by Maysoon Al-Khuraissat on
I'm working on a huge existing Mall, Is the commingled waste approach accepted in LEED V4.1 for the Waste Performance prerequisite?