Preferred Parking and LEED Interpretation 10202

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Saud Abdul Rasheed  on 

Hi all, We have received our Final Design Review and the credit has been denied. Now we want to appeal for the credit as the client is willing to provide Low Emitting and Fuel Efficient Vehicles.

2
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Sat Oct 24, 2015, 6:46 am

EPA TARGET FINDER RATING TOOL FOR A SCHOOL PROJECT IN KSA

Schools-2009 EAp2:Minimum Energy Performance
posted by  VEL MUTHU  on 

Hi, I am currently working on a school project located in KSA. we are about to start the EA P2 and C1.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Sep 19, 2015, 9:00 am

Submetering - Core & Shell 2009

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Mohammad Haj-Ali  on 

We're designing an office building that the owner wants to provide flexibility in leasing, such that tenants can rent certain spaces in the floor, whole floors, or the whole building.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Sep 14, 2015, 1:06 pm

Assembly U-value Calculation

NC-2009 EAp2:Minimum Energy Performance
posted by  MURAT DOĞRU  on 

Dear all, I’d like to ask a question about the assembly U-value calculation according to NFRC norms.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Sep 7, 2015, 8:16 am

ASHRAE 55 Compliance in Dubai

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Annalise Reichert  on 

I am working on a project in Dubai, the design engineer has performed a psychrometric analysis using 46.0°C (DB) and 29°C (WB) for climatic design cooling conditions.

3
Default Avatar
Energy Engineer
7group
LEEDuser Basic Member
18 thumbs up
Wed Jun 17, 2015, 3:54 pm

Fire suppression systems

NC-v4 EAc6:Enhanced refrigerant management
posted by  Jody Lee Potvin-Jones  on 

Hi, Are fire suppression systems and their OPD and GWP addressed by this credit?

3
Default Avatar
engineering manager
javac
LEEDuser Basic Member
0 thumbs up
Tue Apr 28, 2015, 8:39 pm

Pressure loss calculation

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Yaser Al Sharif  on 

We are registed for commercial interior rating system , the system installed in our project is vrv system, in order to comply with optimize energy performance EAC1.3 , critical path supply duct pre

3
Thu Apr 9, 2015, 3:41 pm

School project - Group certification

LEED Guidance for Campuses and Multiple Buildings
posted by  Maya Karkour  on 

Hello, we are working on a new K12 school project with 4 separate buildings (2 bldgs for classrooms, 1 administration and 1 sports center).

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Wed Apr 1, 2015, 4:08 pm

Occupancy Proof

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Deepika Parmar  on 

What is the documented proof required to be submitted to USGBC confirming on the Occupancy considered for our project.

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Mon Mar 30, 2015, 7:09 am

Storage Room with a small window

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Orçun Özhelvaci  on 

Hi everyone, Although I read almost all the comments related with the ventilation requirements of the storage rooms, I could not find the exact answer for my question.

3
LEED Coordinator
Limak Construction Company
LEEDuser Basic Member
0 thumbs up
Tue Mar 24, 2015, 1:39 pm