SRI Value for concerete
NC-2009 SSc7.2:Heat Island Effect—Roofposted by soha yamani on
Is there a standard SRI Value for concrete that i can use to comply with the credit requirements ? as a part of the roof i am using is concerete and the specs is not addressing this part
Infill Site
ND-Plan-v4 SLLp1:Smart locationposted by Jos Schild on
Is there a definition of an 'infill site'?
LEED NCv 2009 Multi-Family Residential: Apartment
NC-2009 EAp2:Minimum Energy Performanceposted by junaid naseer on
Hi All, I have seen this point tackled in many comments earlier but we still have some doubts. We have a residential building of 16 floors which sits on a podium of 3 floors.
Baseline Pumping Power
NC-2009 EAp2:Minimum Energy Performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.
SSp1 and EPA in KSA
NC-2009 SSp1:Construction Activity Pollution Preventionposted by FABIO VIERO on
We are working on two projects located in Saudi Arabia under LEED 2009 certification. We are looking for finding the appropriate measures to be applied, as per EPA’s Construction General Permit an
Estimating the energy cost share of PV
NC-2009 EAc2:On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on
I am working on an industrial LEED project in KSA.
Painting or Coating for Steel Structure
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Ali Soufan on
Hi In a steel structure building, in which the steel is within the building weather proof, two applications are applied: 1- Fire Proof Paint (applied on site) 2- Solvent Based Top Coat Paint (appli
green power source
NC-2009 EAc6:Green powerposted by sherif el adly on
The client have a solar park in a land adjacent to the land on which the project will be built.
smoke leakage test for duct
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Abdulla Anwar on
Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test, prior to final air leakage test since the project specs is giving a small allowable 1% from basis of des
Baseline System 2
NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
As per Table 6.8.1D, I observed the following EER = 12.3-(0.213*Cap/1000) EER Also, Cap means the rated cooling capacity of the product in Btu/hr.