Forum quick links
Does it have to be EXISTING infrastructure?
ND-Plan-v4 SLLp1:Smart locationposted by Jeanne Davidson on
For this pre-requisite, we are developing a materplan where the buildings will be compliant with Option 4 once they are built. But they are not there yet and we are in the middle of a desert.
IAQ Calculator Space Categories
NC-v4 EQp1:Minimum indoor air quality performanceposted by Junaid Mujahid on
In some of our projects, we are providing outdoor air to some spaces which do not require outdoor air supply as per ASHRAE 62.1. For example, water tank room, some storages etc.
Should MAHUs be included in IAQ Calculator
NC-v4 EQp1:Minimum indoor air quality performanceposted by Junaid Mujahid on
In a Mall project, it has multiple kitchens/restaurants which have ecology units that exhaust air (fume hoods).
Partially designed HVAC system
CS-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
I'm creating a PRM energy model for a Mall project which is a Core & Shell project in LEED v4.
Do Daylight and Views Credits Require the Same Regularly Occupied Space?
Warehouses-NC-v4 EQc7:Daylightposted by Alefiya Bhiwandiwala on
I have a question about a project with a core production/assembly area that lacks windows due to confidentiality, so we’ve provided daylight through solar tube wells.
Requesting to Give Greater Emphasis to Live Plants Considering its Significance in Improving Indoor Air Quality and Well-being
posted by Pio Vitharana on
LEED Rating System
Interior Design & Construction: Commercial Interiors
Sky type for Option 2: Illuminance
NC-v4.1 EQc7:Daylightposted by Junaid Mujahid on
If anyone has used IES-VE's RadianceIES application for Daylight Simulation Option 2: Illuminance, what sky type within RadianceIES should be selected for demonstrating compliance?
14 days VOC Emissions Rate
CI-v4 EQc2:Low emitting materialsposted by Alokmay Behera on
One of the internal paints in the project is Greenguard Gold Certified. The TVOC content is 0.22 mg/m3. For VOC content, the threshold limit is fulfilled.
Clubhouse Building Type? Public Assembly or Non-Residential?
NC-v4.1 EAc2:Optimize Energy Performanceposted by Junaid Mujahid on
A clubhouse project with amenities including: Gymnasium, Yoga/Aerobic Studios, Party Hall, Dining Hall, Lounge, Small Retail Stores, Prayer Rooms, Basement Parking should be categorised under which
LEED Future Planned Density and Diverse uses
Hospitality-NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Jayaprakash P M on
Given that our planned v4.1 NC (New Construction) Hospitality project anticipates incorporating diverse uses and increased density in the future (as per the area plan), we are exploring options to