Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Does it have to be EXISTING infrastructure?

ND-Plan-v4 SLLp1:Smart location
posted by  Jeanne Davidson  on 

For this pre-requisite, we are developing a materplan where the buildings will be compliant with Option 4 once they are built. But they are not there yet and we are in the middle of a desert.

0

IAQ Calculator Space Categories

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Junaid Mujahid  on 

In some of our projects, we are providing outdoor air to some spaces which do not require outdoor air supply as per ASHRAE 62.1. For example, water tank room, some storages etc.
 

0

Should MAHUs be included in IAQ Calculator

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Junaid Mujahid  on 

In a Mall project, it has multiple kitchens/restaurants which have ecology units that exhaust air (fume hoods).

0

Partially designed HVAC system

CS-v4 EAp2:Minimum energy performance
posted by  Junaid Mujahid  on 

I'm creating a PRM energy model for a Mall project which is a Core & Shell project in LEED v4. 

1
Fri Dec 6, 2024, 2:51 pm

Do Daylight and Views Credits Require the Same Regularly Occupied Space?

Warehouses-NC-v4 EQc7:Daylight
posted by  Alefiya Bhiwandiwala  on 

I have a question about a project with a core production/assembly area that lacks windows due to confidentiality, so we’ve provided daylight through solar tube wells.

0

Sky type for Option 2: Illuminance

NC-v4.1 EQc7:Daylight
posted by  Junaid Mujahid  on 

If anyone has used IES-VE's RadianceIES application for Daylight Simulation Option 2: Illuminance, what sky type within RadianceIES should be selected for demonstrating compliance?

2
Mon Oct 21, 2024, 6:53 pm

14 days VOC Emissions Rate

CI-v4 EQc2:Low emitting materials
posted by  Alokmay Behera  on 

One of the internal paints in the project is Greenguard Gold Certified. The TVOC content is 0.22 mg/m3. For VOC content, the threshold limit is fulfilled.

0

Clubhouse Building Type? Public Assembly or Non-Residential?

NC-v4.1 EAc2:Optimize Energy Performance
posted by  Junaid Mujahid  on 

A clubhouse project with amenities including: Gymnasium, Yoga/Aerobic Studios, Party Hall, Dining Hall, Lounge, Small Retail Stores, Prayer Rooms, Basement Parking should be categorised under which

9
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Sep 18, 2024, 8:00 am

LEED Future Planned Density and Diverse uses

Hospitality-NC-v4.1 LTc4:Surrounding Density and Diverse Uses
posted by  Jayaprakash P M  on 

Given that our planned v4.1 NC (New Construction) Hospitality project anticipates incorporating diverse uses and increased density in the future (as per the area plan), we are exploring options to

0