Imperil and Metric units?
NC-v4.1 MRc4:Material Ingredientsposted by Kristi Merdler on
I have a project in Canada (metric units) but the client wants all documents in Imperial units. Is this a problem for LEED during the review process?
MR credids
NC-v4.1 MRc4:Material Ingredientsposted by Kristi Merdler on
My project is using a pre-fabicated panel (walls and ceilings) inclusive of doors, windows and ceiling grid lights. All of these components are part of the panel design.
Non default use time for lavatory faucets
NC-v4 WEc2:Indoor water use reductionposted by Ruju Rathod on
We would like to use a non default lavatory faucet duration of 15 seconds instead of the 30 seconds.
Monitoring requirement for CAV/VAV system or fan?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Camilo Velez on
Good afternoon all,
Exemplary performance threshold under v4.1?
NC-v4.1 SSc4:Rainwater Managementposted by Casey Cullen-Woods on
Is anyone able to locate if there is a revised threshold for exemplary performance under v4.1 of this credit? My particular project is a non zero lot line
Rainwater Management- Exemplary Performance
NC-v4 SSc4:Rainwater managementposted by LUCY WILLIAMS on
Per page 194 of the v4 BD+C Reference Guide, the Exemplary Performance section indicates "Manage 100% of rainwater that falls within the project boundary". This is a fairly vague stateme
Can California Projects utilize LI #10480 for LEED V4.1?
NC-v4.1 EAp2:Minimum Energy Performanceposted by Amanda Khury on
LEED V.4 allowed Califoria projects to submit Title 24-2016 documentation to comply with EAP2 and EAC1 by using LI #10480. Can we still use this interpretation for LEED V4.1 projects?