Light meter to obtain light reflectance of finishes?
NC-v4 EQc6:Interior lightingposted by Erin Holdenried on
We are having trouble getting light reflectance values from the manufacturer for a number of finishes. Has anybody tried using some sort of light meter to get the value yourself?
Finding Products that comply with Thermal Emissivity Reference
Pilot-Credits SSpc154:Heat Island Mitigation with Cool Wallsposted by Stephanie Graham on
In the fine print of this credit under the table for adding solar reflectance and thermal emissivity it lists a very recent standard "ASTM/CRRC S-100-2021" which is based on ASTM C1371.
Signage for EV spaces
NC-v4.1 LTc8:Electric Vehiclesposted by Amanda Polematidis on
For those of you who completed the credit, would one sign for an area with EV charging stations suffice, or does each charging station need a sign?
Outside Airflow Monitoring Device
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jennifer Rennick on
The mechanical engineering team on the LEED project I am working on has proposed to install current monitoring switches at each unit supply fan power feed.
Integrative Analysis of Building Materials
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Chris Lombardo on
This Innovation credit allowed our team to align efforts while pursuing the BPDO credit sections and select materials that fulfilled both credit requirements.
Is EIFS Considered an Inherently Non Emitting Material
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Melanie Blacklock on
Hi All,
Has anyone found VOC data for an EIFS System or is it considered to be an inherently Non-Emitting Material. It is mainly composed of cement.
Thank you
Insulation Question
NC-v4.1 EQc2:Low-Emitting Materialsposted by Catherine Blakemore on
If pursuing the insulation category, does roof insulation need to be included? I am assuming that it does, but the credit requirements do not specifically say so.
LEEDv4 HD Quality Views Credit - perimeter area calculation
Healthcare-v4 EQc8:Quality Viewsposted by Tim Hemsath on
Page 740 of reference guide, second paragraph "For other areas, confgure the building foor plates such that the foor area within 15 feet (4.5 meters) of the perimeter exceeds the perimeter area req
CWMP in ND used for individual buildings (BD+C) within ND boundary?
ND-Plan-v4 GIBc16:Solid waste managementposted by Jackson Ludwig on
Working on an ND project, and curious about the CWMP requirement on this credit. Can this same ND CWMP be used on individual buildilngs pursuing BD+C within the ND boundary for materials