Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Under slab insulation required on raised heated (radiant) floor slabs?

Healthcare-v4 EAp2:Minimum energy performance
posted by  Deb Favaretto  on 

Our project is pursuing LEED BD+C for Healthcare v4. Under the Minimum Energy Performance prereq, it is stated that the building must comply with the mandatory provisions of ASHRAE 90.1 2010.

1
Wed May 18, 2022, 1:04 pm

Wet-applied Lubricants

NC-v4 EQc2:Low-emitting materials
posted by  Megan White  on 

Our project is looking at the "Never-Seez NS-160 Regular Grade Compounds" which is wet-applied onsite within the weatherproofing membrane.

5
Default Avatar
LEEDuser Premium Member
1 thumbs up
Tue May 17, 2022, 8:25 pm

Innovation: Design for active occupants

NC-v4 INc1:Innovation
posted by  Jay R  on 

Is it mandatory to answer the "Additional Questions" noted in the credit description, or is that optional?

0

Number of Floors in Project Space, or Building?

Pilot-Credits EQpc117:Quality views in nonregularly occupied spaces
posted by  JLL Sustainability Consulting  on 

The percentage floor area required to have quality views is dependent on the number of floors in the building.  For a CI project, do we count only the number of floors associated with the proj

5
Default Avatar
CA2 CONSULTORES AMBIENTAIS ASSOCIADOS LTDA
LEEDuser Basic Member
0 thumbs up
Tue May 17, 2022, 6:29 pm

Innovation Credit: Procurement of Low Carbon Construction Materials

NC-v4.1 INc1:Innovation
posted by  Bipin Karki  on 

Has anyone achieved this innovation credit yet. We are planning to use Embodied Carbon in Construction Calculator (EC3) to perform calculation for 2 building in the group project.

8
Tue May 17, 2022, 3:12 pm

Drywall Compound

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Catherine Blakemore  on 

Under what category does dryway compound fall for Low-Emitting materials?

2
Tue May 17, 2022, 1:37 pm

View Factor 3

NC-2009 IEQc8.2:Daylight and views - views
posted by  James Bell  on 

I have seen several references to View Factor 3 and cannot find any definition.

4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu May 12, 2022, 6:42 am

Distance to the access point within the limit or not

Healthcare-v4 SSc7:Places of respite
posted by  Priscillia Champagne  on 

Hi, We have an expansion project with operating room, offices, cleaning space for the entire hospital.

0

Bicycle Facilities - Shower requirement

NC-v4 LTc6:Bicycle facilities
posted by  akshaya bhaskar  on 

We are currently working on a park Shelter in a public park In the united states. The shelter is open for bookings to the public for fixed periods at a time.

1
Wed May 11, 2022, 7:51 pm

Fundamental Commissioning of On-Site Solar Array

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Rachel Williams  on 

I am working on a project that, through a series of contract issues during construction, does not have commissioning documents for the PV array.

2
Principal
Hellmuth & Bicknese Architects
LEEDuser Premium Member
20 thumbs up
Wed May 11, 2022, 6:17 pm