Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Drywall Compound

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Catherine Blakemore  on 

Under what category does dryway compound fall for Low-Emitting materials?

2
Tue May 17, 2022, 1:37 pm

View Factor 3

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  James Bell  on 

I have seen several references to View Factor 3 and cannot find any definition.

4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu May 12, 2022, 6:42 am

Distance to the access point within the limit or not

Healthcare-v4 SSc7:Places of respite
posted by  Priscillia Champagne  on 

Hi, We have an expansion project with operating room, offices, cleaning space for the entire hospital.

0

Bicycle Facilities - Shower requirement

NC-v4 LTc6:Bicycle facilities
posted by  akshaya bhaskar  on 

We are currently working on a park Shelter in a public park In the united states. The shelter is open for bookings to the public for fixed periods at a time.

1
Wed May 11, 2022, 7:51 pm

Fundamental Commissioning of On-Site Solar Array

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Rachel Williams  on 

I am working on a project that, through a series of contract issues during construction, does not have commissioning documents for the PV array.

2
Principal
Hellmuth & Bicknese Architects
LEEDuser Premium Member
20 thumbs up
Wed May 11, 2022, 6:17 pm

Option 3 - Product Manufacturer Supply Chain Optimization

CI-v4 MRc5:Building product disclosure and optimization - material ingredients
posted by  Edgar Arevalo  on 

Has anyone been able to tackle the third option for this credit, which is not shown in the BPDO calculator?

0

PM-10 Testing

NC-v4 EQc4:Indoor air quality assessment
posted by  Robert Cashins  on 

What method of testing have people used to measure airborne PM-10 dust required as part of V4 IEQ Credit 3.2?

Is real time monitoring acceptable?

0

No Zone 2, Factor Zone 1 BCTR by 2/3?

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Heather DeGrella  on 

I am editing this question to hopefully make it more clear. Our project is hoping to achieve Bird Collision Deterrence. We have a question on the spreadsheet calculations.

3
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Mon May 9, 2022, 4:47 pm

Furniture to include in LEM documentation?

NC-v4 EQc2:Low emitting materials
posted by  Erica Downs  on 

Under v3, only systems furniture and desk/occasional seating were included.  Under v4/4.1, is ALL (non-permantly installed) furniture now included?  What counts as a piece of furniture?

3
Fri May 6, 2022, 7:18 pm

WE Credit 4 requirement question

Healthcare-v4 WEc4:Water metering
posted by  Nate Maniktala  on 

WE credit 4 Water Metering, requires the following. However our building has at most two of the items on the list and the credit requires five.

3
Mon May 2, 2022, 1:52 pm