Forum quick links
Will a TSCA Title VI Certification Provide Credit for LEED Points?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Angela Rogers on
I have a project looking to get LEED credit for kitchen casework. The boxes will be made of melamine-faced particleboard and the doors made of MDF.
Performance Periods in LEED-EBOM: Rules to Follow--Do these apply to EBOM 4.1?
posted by Brian Salazar on
Hi. We’re working on a LEED EBOM 4.1 project, and I’m trying to understand whether the performance period rules are different for LEED 4.1 than for 4.0. We took a first pass through the
Greenguard Gold in a First Floor of Home environment...
NC-v4.1 EQc2:Low-Emitting Materialsposted by Patty Karapinar on
Hello,
Cooling Water Treatment
posted by Victoria Dubeau on
Is there any guidance or specification around the water treatment of a cooling water system.
Client wants to pursue C&S certification AFTER construction is complete.
posted by Kevin Brock on
Client wants to pursue C&S certification AFTER construction is complete.
Any chance at all this can be done?? THX
Project Certification Question
posted by Teaaron Frye on
My company completed a project in 2020 that was to be LEED certified (was Silver but the designers later realized midway thoughthe project that it wasn't possible) and I was brought in to try
MDF Base
NC-v4.1 EQc2:Low-Emitting Materialsposted by Allen Cornett on
Should MDF base be documented in the Low-Emitting Materials flooring category like wall base, or in the composite
MRc3 Sourcing of Raw Materials - purchase of reclaimed brick
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by chuck merritt on
We are currently sourcing materials for the exterior space of our project and were trying to figure out if locally reclaimed belgian blocks would be applicable to the MRc3 Sourcing of Raw Mate
Envelope commissioning report
NC-v4 EAc1:Enhanced commissioningposted by Diana Giraldo on
We have aproject that had envelope comissioning inspecton done, are there any samples of a report or any guidance for the consultant that completed the inspection?
Calculating Total Required Green Power Quantity for Mixed Use Core and Shell (CS) project
CS-v4 EAc7:Green power and carbon offsetsposted by Josie Plaut on
I'm supporting The HUB RiNo Station project (1000100418 - LEED v4 BD+C: CS ). We are pursuing Green Power and Carbon Offsets credit.