Project with no parking - can we avoid calculations in Option 1
CI-v4.1 LTc5:Reduced Parking Footprintposted by Sophie Kerr on
We are working on the renovation of a lounge inside a small airport in downtown Toronto.
Diverse approaches
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Kath Williams on
This is our fourth project to attempt this credit. A major "lesson learned" is to make sure the intent and requirements are discussed early in concept and SD. This can be an immense hel
Onsite Carbon Sequestration Through Plantings - Pilot credits - SSpc158
posted by Evan Constant on
Option 1 for the Onsite Carbon Sequestration Through Plantings pilot credit requires showing the amount of CO2 sequestered by all trees and shrubs on the proposed site is at a minimum a 10% in
Surrounding Density and Military Barracks
NC-v4 LTc4:Surrounding density and diverse usesposted by Anthony Taibi on
the dwelling unit factor is determined by the zoning- correct?
what is the zoning for military bases? we work on barracks.
Does Boston's MBTA Silver Line count as Bus Rapid Transit?
NC-v4 LTc5:Access to quality transitposted by Eric Dammeyer on
Our team is working on a project in Boston located near the MBTA Silver Line (0.46 miles from the Silver Line Way stop).
Data cabling and carpet quantity difficulty
Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materialsposted by Deb Favaretto on
The language of the Pilot Credit now requires Communications (data cabling).
Infection control resistance to WaterSense fixtures
Healthcare-v4.1 WEp2:Indoor Water Use Reductionposted by Margaret Montgomery on
Has anyone run into a challenge with patient room faucets? We seem to have an infection control team that won't allow less than the 2.2 gpm flow rate, which is not WaterSense compliant.
EVSE and ADA parking spaces
NC-v4.1 LTc8:Electric Vehiclesposted by Bryna Dunn on
Has anyone submitted a project that includes ADA spaces in the spaces served by EVSE? For example, if a total of 3 charging stations are required on a project, and one of those is placed at a
Approved Documentation for the California Department of Public Health General Emissions Evaluation
NC-v4.1 EQc2:Low-Emitting Materialsposted by Summer Gorder on
We are having trouble getting proper documentation from Manufacturers for this additional requirement.