Medical Office Building - Exam | Soiled/Clean Workroom | Mop Sinks - What fixture should these be listed as on the form?
NC-v4.1 WEc2:Indoor Water Use Reductionposted by Catherine Blakemore on
I am working on a LEED v4.1 BD+C Medical Office Building project and trying to complet the WEc1 form. There are no fixture options for for the following fixtures:
ADC - Alternative Daily Cover
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Catherine Blakemore on
Does ADC have to be included in the overall waste total for Option 2 or is it just factor into the overall total for Option 1 only?
Connector Service to other bus routes
CS-v4 LTc5:Access to quality transitposted by Nadia Azzam on
I am working on a project with one of the stops serving a connector service. This is basically a bus route that connects to other routes.
GUT certification for Carpet compliant
NC-v4.1 EQc2:Low-Emitting Materialsposted by Angela Loughry on
Hello-
Agile Working with specific temperature as Thermal Comfort Control
CI-v4 EQc5:Thermal comfortposted by Anik Bastien on
Hello,
Someone posted a similar question, but we pushed it a little bit futher and we would like to have your imput:
Occupant Load & Usage Question
NC-v4.1 WEc2:Indoor Water Use Reductionposted by Catherine Blakemore on
Where does the project Occupant Load and Usage info get logged/docuemnted for the entire project?
Flushing Fixture using Municipal Recycled Water
NC-v4.1 WEp2:Indoor Water Use Reductionposted by Lincon Saki on
Can anyone provide some guidance on how to calculate the reduction rate when the project has alternative water source (municipal recycled water) for flushing fixture.
Desk Fan Fire Safety
NC-v4 EQc5:Thermal comfortposted by Jason Cocek on
Has anyone run into the issue of fire marshall not allowing desk fans due to potential fire hazard? If so, what was the solution?
Deadline for hiring CxA
NC-v4 EAc1:Enhanced commissioningposted by Elizabeth Powers on
Does anyone know if there is a deadline for hiring the CxA in the v4 credit? I know I'd recommend no later than DD, as that but am unclear if v4 has a hard deadline.
Long-term bicycle storage definition - Covered
NC-v4.1 LTc6:Bicycle Facilitiesposted by Luc Doucet on
Is there a guideline as to what constitutes an acceptable "covering" in order to obtain an adequately protected long-term bicycle storage from rain and snow?