Forum quick links
50% of the "building's" electricity -- for Retail??
Retail-CI-v2009 EAc4:Green powerposted by Erica Downs on
Our CI-Retail project accounts for only about 12% of the overall building.
Mold Testing Standards
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Susan Walter on
We have a project and the owner wants to include testing for mold. We had flooding in a project and two AHUs now show signs of mold.
Accused synergies between views documentation & other EQ points
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by emily reese moody on
Hello, We received comments back from our Design review that seem illogical to us; we're looking for some opinions/clarifications here. We submitted representative (fabricated) typical, hypotheti
Daylight savings time
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by James Geers on
I am assuming the daylight modeling must utilize daylight savings time. Is this correct?
EBOM v4 prereqs a barrier?
posted by Nadav Malin on
Gary--I'm interested in your experience with the College that couldn't do EBOM v4 because of the prereqs. Can you say which prereqs were the challenge?
Comms/ data room cooling - Process Energy for LEED
NC-2009 EAc1:Optimize Energy Performanceposted by Victoria Watson on
Hi all, I am working on a project where the CRAC unit manufacturers have said they don't need to comply with the efficiency requirements of ASHRAE 90.1 for a data room and comms rooms air conditio
LEED v4 delay with ACC implications..??
posted by Mark Perepelitza on
One thought that keeps coming into my mind is how this comes on the heals of the recently announced 'partnership' with ACC. My guess is that this has something to do with the delay.
All purpose putty
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by James Emery on
I don't believe putty can be categorized as an adhesive or a sealant, but the proposed putty in our project has a VOC of 161 g/l and is being used for filling nail holes and other defects in refurb
How to model Unit Heaters in Baseline model
NC-2009 EAc1:Optimize Energy Performanceposted by Dónal O'Connor on
To Whom It May Concern: I'm looking for guidance on how unit heaters, radiant panels and electric heaters that are in the proposed design are modeled in the baseline building.
Changing from LEEDv4 to LEED 2009
posted by P Fanfulik on
I registered a project under LEEDv4 (#100038645) because my anticipated completion was past the LEEDv4 sunset date.