Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

State DEQ-Listed Brownfield Site - credit denied

NC-2009 SSc3:Brownfield Redevelopment
posted by  Michele Otazua  on 

In our first review, our credit was denied. We are on a zero lot line property with the building occupying the entire site, but the site is listed on the state DEQ register of brownfield sites.

2
Principal
Studio4, LLC
LEEDuser Expert
120 thumbs up
Mon Jan 26, 2015, 9:00 pm

BDC Material & Resource Calculator- Percentage Regional

CS-2009 MRc5:Regional Materials
posted by  Suha Hyderabad  on 

I have a question regarding the BDC Material Tracker, % Regional.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Sun Jan 25, 2015, 8:07 pm

Plastic Cement Welding & PVC Welding

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Lilian Seow  on 

Page 509-LEED Reference Guide 2009-SCAQMD 1168 [2005]-Table 1 shows the VOC limits for: PVC Welding - 510 g/l Plastic Cement Welding - 250 g/l Most common brands/manufacturers like Oatey, Ipex, We

5
Default Avatar
Principal
LSDesignworks @ Vancouver, BC Canada
LEEDuser Basic Member
9 thumbs up
Thu Jan 22, 2015, 12:14 am

Two new buildings joined by unconditioned walkway

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  P Fanfulik  on 

I have a new bus garage (maintenance and admin offices) connected to the fuel/wash building by an open air bridge (unconditioned space).

2
LEED Project Reviewer, LEED AP BD+C, Senior LEED Specialist
Certifications Department Manager, Epsten Group, Inc.
LEEDuser Basic Member
26 thumbs up
Wed Jan 21, 2015, 5:30 pm

Runoff/Gully Water

NC-2009 WEc1:Water Efficient Landscaping
posted by  Tamary Alvarez  on 

Our project's environmental site assessment has documented a gully resulting from the runoff of the adjacent site dumping into our site.

2
LEED Fellow, WELL AP
JLL
LEEDuser Basic Member
125 thumbs up
Wed Jan 21, 2015, 1:22 pm

Two lighting related questions

CI-2009 EAp2:Minimum Energy Performance
posted by  Ramana Koti  on 

1. How does one overcome the limitation of number of rows in the ASHRAE Lighting Compliance Documentation PDF form?

2
Tue Jan 20, 2015, 8:59 pm

Naturally ventilated elevator lobby in mech. ventilated bldg.

NC-2009 IEQc2:Increased Ventilation
posted by  Lawrence Lile  on 

I have a very small elevator lobby, which has a little mini-split unit without outside air.

8
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Tue Jan 20, 2015, 7:04 pm

Ongoing Consumables in HC Clinic

EBOM-v4 MRp1:Ongoing purchasing and waste policy
posted by  Michelle DiPenti  on 

Is there a clear answer on which ongoing consumables to include in the policy?

4
Program Coordinator
Transwestern Sustainability Services
LEEDuser Expert
5 thumbs up
Fri Jan 16, 2015, 8:58 pm

LEED Boundary / Silt Fencing

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Carrie Laurendine  on 

Currently working on a project that is a large site with an existing building currently on the site.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jan 14, 2015, 6:04 pm

Indoor/Outdoor Pool

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Tom Liebel  on 

We're wrestling with the walkoff mat requirement for a recreation center where there is an indoor/outdoor pool - one end of the pool and the roof retract during clement weather to provide an outdoo

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Mon Jan 12, 2015, 9:15 pm