Compliance for single story building
Pilot-Credits EQpc78:Design for active occupantsposted by Johnathan Woodside on
The title of the pilot credit implies occupant activeness in general, but the credit focuses significantly on staircases as the means of activity.
IEQ 4.4 - does veneer apply ?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Denise Bates on
The credit language states: particle board, MDF, wheatboard, door cores, and laminating adhesive used for assemblies. We have a reconstituted teak veneer that will go on wood panels and doors.
Appeal for additional credits after final review.
posted by Zane Lichtneger on
The Standard Preliminary Review is complete and the building has received 57 points. My question is- Can we submit for additional points not included in the initial submission?
Rounding of Percent Energy Cost Savings for EAc1 Points
NC-2009 EAc1:Optimize Energy Performanceposted by Joseph Chappell on
Hi all, We recently received a final design review where our percent energy cost savings have been corrected by the reviewer to show 31.95%.
Construction credit review v2009
posted by Deborah Locklair on
I just inherited a project after the initial design (already approved) and initial construction credits were submitted.
Process Energy Savings - Exceptional Calculation - Dry Coolers
NC-2009 EAc1:Optimize Energy Performanceposted by MYRON JORDAN on
My inquiry is based upon reducing the energy consumption of a chilled water system which is being used in a manufacturing facility.
Defining Boundary for Energy Performance
NC-2009 EAp2:Minimum Energy Performanceposted by Ralph Bicknese on
For a renovation and addition to an existing college campus library, we are in the process of determining the boundary to use for energy performance. The existing building is 182,738 SF.
MRc4 vs MRc7
Healthcare-v4 MRc7:Furniture and medical furnishingsposted by John Long on
We are an FSC-certified (brand new) casework manufacturer. We are submitting our very first FSC job. This job is also a LEED project.
LEED-NC or LEED for Homes (and v3 vs v4)?
posted by emily reese moody on
Hello, I've tried calling USGBC, who told me to email certinfo@usgbc.org. I did that a little over 2 weeks ago, and have yet to get a response.
DES for a combination of rated and non-rated building
NC-2009 EAp2:Minimum Energy Performanceposted by Bradley Felts on
I have a project that will be conditioned by a water-cooled chiller and boiler plant located in one of the building that will be rated.