Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

How to calculate capacity for commercial ice makers?

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Lindsay Austrom  on 

I have a project with a commercial kitchen, so we're gathering info on all of the walk-in coolers, freezers, etc.

3
Mechanical Engineer
Hyder Consulting
LEEDuser Basic Member
1 thumbs up
Mon Dec 21, 2015, 9:47 pm
3
Project Manager
A3C Collaborative Architecture
LEEDuser Basic Member
1 thumbs up
Fri Dec 18, 2015, 5:25 pm

Resort Hotel and Condo

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  John Zehren  on 

I am working on a 7 story resort hotel and condo under LEED 2009 NC. We just received word that the 9 Condos on floors 6 and 7 will be finished at a future date.

4
Default Avatar
Zehren and Associates
LEEDuser Basic Member
2 thumbs up
Fri Dec 18, 2015, 12:01 am

Winter resort

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  John Zehren  on 

Our project is located in a winter ski resort village with heavy snowfall. The likelihood of someone biking here in the winter is slim.

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Dec 17, 2015, 4:53 pm

Carpet in LEED v4

NC-v4 EQc2:Low emitting materials
posted by  Ben Campbell  on 

Is it just me, or is there not much to work with in terms of compliant carpet for Low-Emitting Materials in LEED v4?

3
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Thu Dec 17, 2015, 7:30 am

EBOM Campus and Performance Periods

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Kath Williams  on 

How is the performance period determined when submitting EBOM campus credits under master site? Individual buildings will not be submitted for 8 more months but the campus credits are ready now.

3
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
103 thumbs up
Wed Dec 16, 2015, 9:06 pm

Historical Building

NC-2009 EAp2:Minimum Energy Performance
posted by  Khaled Fouda  on 

I am working on renovating a NYC historical building. per NYC Energy Conservation Code 101.4.2, this project is exempted from meeting the wattage allowance.

3
Design Engineer, LEED AP (BD+C)
Energy Concepts
LEEDuser Basic Member
5 thumbs up
Wed Dec 16, 2015, 4:05 pm

Lighting Controls Exemption

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Katherine Roth  on 

Our project received the following review comment: "If any building spaces do not have automatic lighting control, provide information on the use and square footage of these spaces.

3
Tue Dec 15, 2015, 8:27 pm

CDPH v1.1-2010 Section 3.8.6.1

NC-v4 EQc2:Low emitting materials
posted by  Craig Graber  on 

Hi, this is Josef Abboud with Atelier Ten. An aspect of the VOC general emissions evaluation is unclear: the definition within the LEED reference guide for the general emissions test claims the ma

2
Thu Dec 10, 2015, 2:51 pm

Guidance for IDEC Systems?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Dustin Campbell  on 

Does anyone have experience applying the “USGBC LEED 62MZCalc” spreadsheet for Indirect Evaporative Cooling (IDEC) systems? Or, is there an alternate compliance path elected due to the significant

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Wed Dec 9, 2015, 3:24 pm