Forum quick links
Hotel Interiors and Guestroom Furniture
CI-2009 MRc4:Recycled Contentposted by Sara Zoumbaris on
Hello All, I am piggy backing off a discussion under EQc4.5 found at the link below:(http://www.leeduser.com/credit/ci-2009/ieqc4.5#comment-50494) in reference to guestroom furniture for a hotel.
Blue Roofs
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Kerrie Racicot on
Does anyone have any experience with blue roofs? Would LEED accept a minimum of 50% of the roof being covered by a blue roof rather than a green roof? I can't find any precedent for this.
Walk off mat length within vestibule
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maria Papiez on
Have there been any exceptions to the walk-off mat length requirement when vestibules are located at an exterior entry?
Credit MR 7 Certified Wood Question
Schools-2009 MRc7:Certified Woodposted by Sara Axon on
We are working on a project that has this requirement in the contract: "Credit MR 7: Provide a minimum of 50 percent (by cost) of wood-based materials that are produced from wood obtained from for
Option on Survey of Fuel-efficient Carpool /Vanpool?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Michelle Bracewell-Musson on
Hello, I have used a survey that was accepted by GBCI based on the Leeduser Template, however, I feel like it would streamline the process if I gave two additional options in the How You Travelled
CrowdComfort - Credit IEQc7.2
CI-2009 IEQc7.2:Thermal Comfort—Verificationposted by Scott Balboni on
Hi All, I work for a tech start-up called CrowdComfort and we're looking to potentially partner with the Massachusetts USGBC.
Eyeball Audits as Backup for Commingled Diversion
Homes-v2008 MRc3:Waste managementposted by Michelle Rosenberger on
Hi Ann, This is a repost from NC, MRc2. I am hoping that you can shed some light on this. Our Seattle region has a very developed state regulated construction waste diversion infrastructure.
Where is the line again?
NC-2009 MRc7:Certified Woodposted by Daniel Hartsig on
There are specific inclusions for bamboo and cork (neither are wood) in MRc7, but it is still unclear where to draw the line between solid, wood chip and wood fiber products that still look like wo
The amount of REC's necessary if onsite solar credits are sold
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Edmée Knight on
My buildings roof is covered in solar panels that generate at least 20% of the building's annual energy.
Credit Form Problems
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by James Keohane on
I am having difficulty demonstrating compliance for Option C Occupancy Sensors.