Forum quick links
SSc4.3 Low-Emitting and Fuel-Efficient Vehicles Parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Shad Traylor on
SSc4.3 credit: Low-Emitting and Fuel-Efficient Vehicles, The project is located on a large campus, do the preferred FE/LE parking spaces need to be located within the LEED project boundary? And if
Open Space Accessibility
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ilana Judah on
We have a Residential project in New York City (complies with credit SS 2), and the ground level is a small amount of retail and a community space.
Minimum Benefit to Achieve ID Credits
posted by Aaron Smith on
Hello, It seems to me I read at some point in time that the CaGBC wanted to see a minimum measurable benefit for Innovative Strategies.
Fire Extinguisher & Cabinet (MRc4 & MRc5)
NC-2009 MRc4:Recycled Contentposted by Elliot Young on
Hi, we just received a submittal for fire extinguishers and recessed fire extinguisher cabinets - claiming to have recycled content and regional materials.
New Option: Outdoor walking path
Pilot-Credits EQpc78:Design for active occupantsposted by Stephanie Graham on
I'd like to see an option for a walking/running path on the site of at least a mile in length and/or fitness cross-training stations at intervals along the path.
Square Footage of Parking Areas
NC-2009 PIf2:Project Summary Detailsposted by Deirdre Espiritu on
Where are the guidelines on how to do this takeoff? Because parking is connected by vehicle circulation spaces as well is it correct to just use the area of the actual parking spaces?
Dark underground ballroom and regularly occupied space exception
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Olivier Brouard on
Hi everyone, Working on a conference center, we are close to get to Gold Certification by 2 points.
Old to be reused equipement
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Kalyan Nishtala on
Hi, I am currently working on an office building which is aiming for LEED Silver under CI (2009).
Baseline HVAC Systems
NC-2009 EAp2:Minimum Energy Performanceposted by Khaled Fouda on
I am Energy Modeling a highrise new construction in NYC.
Planting recycled conent
NC-2009 MRc4:Recycled Contentposted by Thomas Perkins on
“Site materials (31.60.00 Foundations, 32.10.00 Paving, 32.30.00 Site Improvements, and 32.90.00 Planting) that are permanently installed can be included in the MR credits.