Waste Stream Audit

EBOM-v4 MRp1:Ongoing purchasing and waste policy
posted by  Trevor Anderson  on 

Under LEED v4, is the waste audit requirement the same for projects achieving initial certification and recertification, or do recertifying projects need to conduct one waste audit for each year of

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu May 5, 2016, 5:32 pm

Purpose behind the 60% RH parameter?

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Landry Watson  on 

The reference guide is clear that 14,000 CFM of OA per SF (that is >60deg and

5
Assistant Vice President - Sustainability
Alexandria Real Estate Equities
LEEDuser Premium Member
26 thumbs up
Wed May 4, 2016, 11:56 pm

Path 2 Flushout

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Amy Harmon  on 

Our project went with Path 2 Post-occupancy flush out. All AHUs required 2-4 days of flush out before occupancy could occur and about 24 days post occupancy.

10
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed May 4, 2016, 10:08 pm

Data Center Modeling - LEED CS version 2009

CS-2009 EAp2:Minimum Energy Performance
posted by  Anurag Joshi  on 

Dear fellow modelers, I have a query regarding modeling and saving percentage calculation for datacenter buildings for LEED CS -2009.

3
Wed May 4, 2016, 4:24 pm

Alternate Transportation: SSc4.3 and SSc4.4

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Greg Snow  on 

Hi Everyone, I am filling out the LEED letter template for SSc4.3 and SSc4.4 and don't know which path/option I should check.

5
Tue May 3, 2016, 5:32 pm

EAc3 - Enhanced Commissioning, LEED v2009

NC-2009 EAc3:Enhanced Commissioning
posted by  Jared Reed  on 

Our project is pursuing EAc3 - Enhanced Commissioning. The reference manual states that the CxA performing the enhanced commissioning must also perform the fundamental commissioning.

7
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon May 2, 2016, 3:37 pm

Timeline to File an Appeal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Jason Moody  on 

Our project was denied credit due to a failed pre-requisite during the final review. The client once us to file an appeal to address the pre-requisite.

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Sun May 1, 2016, 10:06 pm

Exemplary Performance?

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  José Solis  on 

The BD+C Reference manual states: "This credit is not eligible for exemplary performance under the Innovation in Design section." However, a response from Tristan Roberts on June 4, 2010 states th

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Apr 25, 2016, 6:47 pm

Room Input Report

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Bill Friedl  on 

I had a comment on a LEED review in IEQc7.1 to provide a summary table which lists the heating and cooling design parameters used for each space type and the Room Input Reports for each space type.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Apr 25, 2016, 6:12 pm

Option 1 Path 2 Temperature and Humidty Requirements

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Amy Harmon  on 

Path 1 indicates flush-out needs to be accomplished with 14,000 cu ft. of OA per sq. ft. of floor area while maintaining an internal temperature of at least 60 deg F and no more than 60% RH.

3
Default Avatar
Scheeser Buckley Mayfield
LEEDuser Basic Member
0 thumbs up
Fri Apr 22, 2016, 2:07 pm