Forum quick links
walk-in closets in residential
NC-2009 IEQp1:Minimum IAQ Performanceposted by Alfonzo Collins on
I would like to know if there's any way I can consider walk-in closets in a residential building as unoccupied spaces.
Material Streams in New Construction
NC-v4 MRc5:Construction and demolition waste managementposted by Allison Wilson on
My best understanding is that there are five possible material diversion streams: - Commingled recycled - Donated - Recycled – source separated - Reused - Salvaged My question is this: how do you
Number of Trips
EBOM-v4 LTc1:Alternative transportationposted by JOHN COOK on
On the Alternative Transportation Calculator does " number of vehicle trips" imply one way or round trip?
Central Energy Plant and Service hot water heating
NC-2009 EAp2:Minimum Energy Performanceposted by ESD Engineer on
My project is a hospital building and has a central energy plant which serves the building pursuing for LEED NC certification, i am modeling the plant efficiency based off DESv2 option 2 as the pro
Scorecards are needed?
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Maki San Miguel Paulson on
1. When I registered for pilot credit 112 for LEED 2009 ID+C CI in February of 2017, there was no explicit credit documentation requirements that listed the need to obtain scorecards for each produ
Existing Envelop for Baseline case
Schools-NC-v4 EAp2:Minimum energy performanceposted by John on
I am modelling a school building where the new insulation is being added to the existing walls.
Installation of Lighting Posts
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Claire Bannister on
We are having two large solar to LED light poles installed in our parking lot. Would this be included in this Facility Maintenance & Renovation credit, as well as "Purchasing- Lamps"?
Green Cleaning Plan
NC-2009 IDc1:Innovation in Designposted by Gregory Martin on
Just received comments back on a project and was surprised at the number of issues with our Green Cleaning Policy. This is a template I have used without any comments/issues in the past.
Owns Building
CI-2009 EAc3:Measurement and Verificationposted by Kristopher Croghan on
If a client owns all of the interior space, then I assume that they would obtain this credit, since they pay all of their energy and water bills. Would I be correct?
LEED v4 Requirements documentation
posted by nancy picard on
Hi, I've been searching for LEED v4 Canadian Construction Documents (01 35 21), but the update hasn't been performed yet.