Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

walk-in closets in residential

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Alfonzo Collins  on 

I would like to know if there's any way I can consider walk-in closets in a residential building as unoccupied spaces.

5
Thu Jul 20, 2017, 2:36 am

Material Streams in New Construction

NC-v4 MRc5:Construction and demolition waste management
posted by  Allison Wilson  on 

My best understanding is that there are five possible material diversion streams: - Commingled recycled - Donated - Recycled – source separated - Reused - Salvaged My question is this: how do you

2
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Wed Jul 19, 2017, 10:45 pm

Number of Trips

EBOM-v4 LTc1:Alternative transportation
posted by  JOHN COOK  on 

On the Alternative Transportation Calculator does " number of vehicle trips" imply one way or round trip?

5
Wed Jul 19, 2017, 7:16 pm

Central Energy Plant and Service hot water heating

NC-2009 EAp2:Minimum Energy Performance
posted by  ESD Engineer  on 

My project is a hospital building and has a central energy plant which serves the building pursuing for LEED NC certification, i am modeling the plant efficiency based off DESv2 option 2 as the pro

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jul 13, 2017, 4:10 pm

Scorecards are needed?

Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishings
posted by  Maki San Miguel Paulson  on 

1. When I registered for pilot credit 112 for LEED 2009 ID+C CI in February of 2017, there was no explicit credit documentation requirements that listed the need to obtain scorecards for each produ

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Wed Jul 12, 2017, 7:32 pm

Existing Envelop for Baseline case

Schools-NC-v4 EAp2:Minimum energy performance
posted by  John   on 

I am modelling a school building where the new insulation is being added to the existing walls.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Mon Jul 10, 2017, 3:16 pm

Installation of Lighting Posts

EBOM-v4 MRc3:Purchasing - facility maintenance and renovation
posted by  Claire Bannister  on 

We are having two large solar to LED light poles installed in our parking lot. Would this be included in this Facility Maintenance & Renovation credit, as well as "Purchasing- Lamps"?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Jul 6, 2017, 6:58 pm

Green Cleaning Plan

NC-2009 IDc1:Innovation in Design
posted by  Gregory Martin  on 

Just received comments back on a project and was surprised at the number of issues with our Green Cleaning Policy. This is a template I have used without any comments/issues in the past.

2
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
103 thumbs up
Wed Jul 5, 2017, 7:08 pm

Owns Building

CI-2009 EAc3:Measurement and Verification
posted by  Kristopher Croghan  on 

If a client owns all of the interior space, then I assume that they would obtain this credit, since they pay all of their energy and water bills. Would I be correct?

4
Wed Jul 5, 2017, 4:57 pm

LEED v4 Requirements documentation

LEED Canada Forum
posted by  nancy picard  on 

Hi, I've been searching for LEED v4 Canadian Construction Documents (01 35 21), but the update hasn't been performed yet.

6
Default Avatar
President
Solterre Inc.
LEEDuser Premium Member
47 thumbs up
Thu Jun 29, 2017, 8:01 pm