Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

raw material invoice submital

Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Esther Kohout  on 

I am trying to locate the info that shows the total cost of material is to be used in LEED calulations, not including the installation labor.

0

Empty parking spots

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  S. Macgregor  on 

We are installing alternative-fuel refueling stations, with preferred parking.

1
Thu Jan 8, 2015, 4:56 pm

Which rating system to use

CI-v4 INc2:LEED Accredited Professional
posted by  Pamela Smith   on 

Major renovation of a 3 story office building in a historic district. Basically zero lot line, cannot change the exterior, pooled parking with neighboring buildings. Select for BDC or IDC?

1
Sat Aug 26, 2017, 6:17 pm

Exercise Equipment

Pilot-Credits EQpc78:Design for active occupants
posted by  Eric Carbonnier  on 

Are squishy stress balls that focus on hand reflexology to release stress considered exercise equipment?

1
Tue Jun 28, 2016, 3:32 pm

Brownfield Documentation

NC-2009 SSc3:Brownfield redevelopment
posted by  Ivan Romero  on 

I've scanned the discussions on Brownfield and didn't see this addressed directly.

1
Thu Aug 20, 2015, 9:12 pm

when we register a pilot credit....

Pilot-Credits EApc65:Monitoring based commissioning
posted by  Gail Napell  on 

we registered the pilot credit; is it supposed to show up in the project in LEEDonline? how do we upload the documentation???? thanks for guidance -

0

Transients for complex occupancy

NC-2009 PIf3:Occupant and Usage Data
posted by  David Browne  on 

In trying to determine the peak transients and daily average transients for a building with several distinct user groups, my client has given me a schedule of when each group will use the building

1
Fri Mar 18, 2016, 3:12 pm

non-irrigation credit

NC-v4 WEc2:Indoor water use reduction
posted by  henry nguyen  on 

Hello. If my project will have no water use for permanent irrigation sys after 2 yrs threshold and it has used of native plants, I wd instantly qualified for 2p, given this is a Rqmt and ALSO a cre

1
Fri Jun 9, 2017, 1:48 pm

Roof Terrace Storm Drains

NC-2009 SSc6.2:Stormwater design - quality control
posted by  Jeannie Rueter  on 

I'm working on a major remodel project next to the ocean.

1
Fri Jul 14, 2017, 2:30 pm

Exterior Lighting Baseline vs Proposed

NC-2009 EAp2:Minimum energy performance
posted by  Maria Unruh  on 

I'm trying to understand baseline exterior lighting versus the proposed. My calculations show that my proposed is less than my baseline, is this okay?

1
Tue May 26, 2015, 7:42 pm