Forum quick links
Commingled or Source Separated
NC-2009 MRc2:Construction Waste Managementposted by Risto Beatty on
Could someone please help define the meaning of 'source separated' in terms of the Material Stream credit calculator?
Dorm Room Controls, no mechanical cooling
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Michele Helou on
We have a dormitory project with about 80% individual rooms and 20% double rooms. Each room is provided with a Thermostat and an operable window with over 4% operable window to floor area ratio.
Rainwater Management
Data-Centers-NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project?
Feedback on test results?
CI-v4 EQc4:Indoor air quality assessmentposted by Joanna Switzer on
Hey all, I've heard informally from one lab that they are seeing a number of v4 projects fail their IAQ tests - appears the newly introduced glycol level thresholds are a common obstacle.
FAR for parks with pavillion
NC-v4 SSc3:Open spaceposted by nancy picard on
I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?
The Eco Declaration
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Kristopher Croghan on
Many of our client's printers have received The Eco Declaration, an ECMA-370 Standard. Does this comply with the LEED 4 criteria?
Heated Bus Storage
NC-v4 EAc2:Optimize energy performanceposted by Victoria Watson on
Hi, I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline.
Using different energy rates between CHP Proposed and Baseline
NC-v4 EAp2:Minimum energy performanceposted by Mark Benson on
I know that the 90.1 and the LEED Reference Guide generally tell you to use the same utility rate structures for both the Proposed and Baseline models.
Lease requirements for this credit
CS-2009 IEQc2:Increased Ventilationposted by Troy Glasner on
Hi, I am just wondering what specific lease requirement language would be needed for this credit.
LEED lease agreement for CS
CS-2009 IEQc2:Increased Ventilationposted by Alfonzo Collins on
I am working on a core & shell building. The owner will only be installing AHUs for a few core & shell spaces.