Forum quick links
raw material invoice submital
Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Esther Kohout on
I am trying to locate the info that shows the total cost of material is to be used in LEED calulations, not including the installation labor.
Empty parking spots
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by S. Macgregor on
We are installing alternative-fuel refueling stations, with preferred parking.
Which rating system to use
CI-v4 INc2:LEED Accredited Professionalposted by Pamela Smith on
Major renovation of a 3 story office building in a historic district. Basically zero lot line, cannot change the exterior, pooled parking with neighboring buildings. Select for BDC or IDC?
Exercise Equipment
Pilot-Credits EQpc78:Design for active occupantsposted by Eric Carbonnier on
Are squishy stress balls that focus on hand reflexology to release stress considered exercise equipment?
Brownfield Documentation
NC-2009 SSc3:Brownfield redevelopmentposted by Ivan Romero on
I've scanned the discussions on Brownfield and didn't see this addressed directly.
when we register a pilot credit....
Pilot-Credits EApc65:Monitoring based commissioningposted by Gail Napell on
we registered the pilot credit; is it supposed to show up in the project in LEEDonline? how do we upload the documentation???? thanks for guidance -
Transients for complex occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by David Browne on
In trying to determine the peak transients and daily average transients for a building with several distinct user groups, my client has given me a schedule of when each group will use the building
non-irrigation credit
NC-v4 WEc2:Indoor water use reductionposted by henry nguyen on
Hello. If my project will have no water use for permanent irrigation sys after 2 yrs threshold and it has used of native plants, I wd instantly qualified for 2p, given this is a Rqmt and ALSO a cre
Roof Terrace Storm Drains
NC-2009 SSc6.2:Stormwater design - quality controlposted by Jeannie Rueter on
I'm working on a major remodel project next to the ocean.
Exterior Lighting Baseline vs Proposed
NC-2009 EAp2:Minimum energy performanceposted by Maria Unruh on
I'm trying to understand baseline exterior lighting versus the proposed. My calculations show that my proposed is less than my baseline, is this okay?