Forum quick links
RE: Vanpool Parking for a Core and Shell
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Troy Glasner on
Hello, I am working on a C&S project. The minimum parking capacity set by local zoning is 165 parking spots. The project has 165 spots exactly. The project size is 86000 sq ft.
Campus Registration instead of Block?
posted by Deborah Lucking on
Hello all. I notice on LEED Online that there is now an option to register a new project under "Campus" but not under "Block", which USED to be the way to start the registration process for multipl
Cafeterias with kiosks,
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Aishwarya Balagopal on
We are currently working on a cafeteria project for a campus project. The cafeteria has several food serving kiosks (zones) distributed across the dining floor plan.
Limited access for inpatient units
Healthcare-v2009 SSc9.2:Connection to the natural world - direct exterior access for patientsposted by Brian Pescod on
We're looking at this credit as a potential Innovation in Design for a Long-Term Care BD+C project.
Critical Path Supply Duct Pressure Drop Calculations
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Bryan Lanier on
Currently working on a tenant project. Base building chilled water to each floor supplying DOAS Terminal Units. I'm planning on supplying PD calcs for representative units.
Policies - credit's pursued
EBOM-v4 SSp1:Site management policyposted by Allison Smith on
I'm looking for some guidance regarding drafting policies. I've downloaded the USGBC templates, however do we need to include sections related to credits that we are not pursuing?
IEQc5 Daylight Measurements
EBOM-v4 EQc5:Daylight and quality viewsposted by Alexa Stone on
Does the daylight measurement need to show compliance at both measurements to achieve the credit? We are making improvements that comply on the 2nd measurement. Please advise and thanks.
Coat area - regularly occupied?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Eric White on
We have an K-6 school project which is mostly views-compliant. One issue we are having in getting above 90% views requirement is the coat area at the rear of the classroom.
biochar
EBOM-2009 IOc1:Innovation in Operationsposted by Patricia Andrasik on
Hello all, We are attempting the IO credit at the Catholic University of America by adding a lesson plan to our Principles of Environmental course to make our own biochar (a soil additive that se
Ventless Dryers
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Mark Gardner on
We are working on a project considering the use of ventless dryers. Has anyone ever used ventless dryers and had a problem complying with IEQc5? Thanks!