Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Daylight Measurements disappointing

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Joyce Kelly  on 

1.Measurements were disappointing July 15 because shading structures are doing their job and blocking direct sunlight - a blessing in Southern Arizona. Should we wait until the nx.

1
Fri Aug 14, 2015, 12:50 pm

Concrete coating

CI-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Katie Diedrich  on 

Currently working on a job which is under Commercial Interiors v2009. There is an existing concrete floor which is going to be sealed. Which coating type would this need to be classified as?

1
Thu Nov 17, 2016, 6:39 pm

Previously Submitted Documentation

CI-2009 PIf5:Previously LEED Certified Details
posted by  CHRISTIAN LUTJEN  on 

Hello, we are embarking on a new LEED 2009 C.I. project in a building that has already achieved a LEED Gold rating for Core and Shell.

1
Tue Dec 29, 2015, 5:22 pm

Prefinished wood flooring

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Brianna Brandsen  on 

when installing prefinished wood flooring in a building that is attempting LEED certification, does the finish need to be compliant with LEED regulations, as you are not applying the finish on site

1
Fri Feb 10, 2017, 7:02 pm

Project Building Context

NC-2009 PIf2:Project Summary Details
posted by  Deirdre Espiritu  on 

Where can I find guidance on what density is considered Urban or SubUrban?

1
Mon Feb 1, 2016, 4:16 pm

Dynamic Glazing for IDC ?

NC-v4 INc1:Innovation
posted by  Sriranjani Ramachandran  on 

Can anyone claim points under the Innovation in Design Credit-Path 1 for using dynamic Glazing in the project?

1
Wed May 17, 2017, 3:57 pm

Fenestration U-value: Framed versus Center-of-Glass

NC-2009 EAc1:Optimize energy performance
posted by  Paul Cimaglia  on 

I received a review comment requesting confirmation that my modeled fenestration U-value accounts for framing. I'm having a difficult time contacting the window manufacturer.

1
Wed Dec 10, 2014, 4:52 pm

MPR3 - Hotel in Mixed Use Building

CI-2009 MPR3:Must use a reasonable site boundary
posted by  Sara Zoumbaris  on 

Hi - We are working on a (new construction) CI project for a hotel which is located in a larger building with multiple tenants.

0

short term bicycle storage

NC-v4 LTc6:Bicycle facilities
posted by  sue bryant  on 

Can this be located inside a building as long as it is within 100' of the main entrance?

1
Wed Jul 22, 2015, 2:08 am

mirror mastics that contain carcinogenic ingredient

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Debra A. Lombard  on 

The two mirror mastics that I found both contain carcinogenic ingredients, however they both meet the VOC limit of 250 g/L.

0