recessed walk off mat

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Bomin Kim  on 

We are specifying a recessed walk off mat for the building in the vestibule (8' long). I remember that if the walk off mat is 10', a point is granted.

1
Thu Apr 14, 2016, 11:29 pm

Fabricator's location

NC-2009 MRc5:Regional Materials
posted by  Mahsa Nicknam  on 

IF the manufacturer's location is within 500 miles however fabricator's location is not, does it still have contribution to this credit OR not? In another word, when manufacturer location is withi

1
Sun Mar 15, 2015, 5:57 pm

Regional Priority points not being awarded?

CS-2009 RPc1:Regional Priority
posted by  Ashley Love  on 

I just received our Design Final Review back and we have three credits (WEc3, EAc1, and IEQc7.1) that we have been awarded that are also regional priority credits.

1
Mon Jun 20, 2016, 7:36 pm

Undisturbed site areas within LEED project boundary?

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Edgar Arevalo  on 

I have a project where a patch of forestry has been removed for a new university building.

1
Mon Aug 28, 2017, 1:30 pm

AstroTurf

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Alexis Voeltner  on 

What is LEED's stance on AstroTurf? I have a building that replaced all of their grass with this and am curious if it is now considered hardscape.

1
Fri May 15, 2015, 6:48 pm

VRF Systems - Option 1 of EAc1.3

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Roger Carter  on 

I am looking for some feedback on the interpretation for appropriate zoning and controls. It appears that every solar exposure must have a separate control zone.

1
Fri Jul 24, 2015, 3:19 pm

Option 2. Connectivity

ND-Plan-v4 SLLc1:Preferred locations
posted by  Sarah Kearney  on 

I want to make sure I understand this correctly.

1
Tue Nov 29, 2016, 10:24 pm

Excluding demand for occupancy sensors in retail sales area

Retail-CI-v2009 EAc1.2:Optimize energy performance - lighting controls
posted by  Eleftherios Zacharakis  on 

I have a retail store that the sales area is always occupied and therefore not on occupancy sensor. The sales floor is on a time clock instead. The rest of the store is on occupancy sensor.

0

Successful CIR: Audio Tours as Green Education (Canada)

NC-2009 IDc1:Innovation in Design
posted by  Jackie Kanyuk  on 

We've received a successful CIR ruling on our Green Education Audio Tour package, which is a slide show with audio (recorded on site), and an online case study.

0

Account for local and utility central energy plants

NC-v4 EAp2:Minimum energy performance
posted by  S. Sachs  on 

We are building an addition to an existing building that has a central plant that is outside of our LEED boundary. However, we also have a contract to improve the performance of the central plant.

1
Wed Apr 26, 2017, 10:49 pm