Forum quick links
New wind turbines
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by charles bell on
My client has a LEED NC silver award from about 10 years ago.
LEED CREDITS
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by kobby akuffo on
1. What information must you have to complete the calculations for the LEED EQ Credit Low-Emitting Materials Composite Wood and Agrifiber Products. 2.
Process water and residential units
NC-v4 WEp2:Indoor water use reductionposted by MAUDE PINTAL on
Our project includes a community center and a multi-residential part.
Reduction of impervious area
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Danielle Spicer on
I have a project where we are promoting infiltration by installing permeable pavers for a portion of the pavement, and we are capturing and treating runoff from 90% of the average annual rainfall e
Requirement to survey students in higher ed bldgs?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Renee Shirey on
In earlier versions of LEED 2009, the credit language specifically clarified that occupants included students grade 6 and above.
Evaporative water use
NC-v4 WEp2:Indoor water use reductionposted by MKK LEED on
The new prerequisite states "No once-through cooling with potable water for any equipment or appliances that reject heat". Does this exclude IDDE systems?
Protect Habitat on Campus
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Marissa Hebert on
Our project is a large medical campus with multiple buildings on a greenfield site.
CS v2009 Appendix 4 - Lease and Sales agreement
posted by Becky Stumm on
I have a project that the owner/landlord are seeking LEED-CS certification, but none of the tenants have any interest in seeking LEED-CI certification.
Denial of EA PR2
NC-2009 EAp2:Minimum Energy Performanceposted by Roxanne Button on
A client has asked for my advice in appealing the denial of PR2. I've taken a quick look at the review comments but will be digging deeper into it in the next couple of days.
Baseline Lighting Power for a Major Renovation
NC-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
We are replacing the mechanical system, updating the plumbing system and insulating the building envelope for an existing office building.