Forum quick links
green cleaning
CS-2009 IDc1:Innovation in designposted by Alfonzo Collins on
Realizing I should have posted this here...I received a comment on a design phase review that since this is a core & shell building, the owner has to either include green cleaning in the lease,
Precertification - LEED 2009 Core & Shell
CS-2009 SSp1:Construction activity pollution preventionposted by Michael Heacock on
We are working on submitting a precertification. I'd thought the credits team was working on were design phase. If I submit the precertification, can I quickly turn in for design phase.
Asbestos Abatement Requirement Compliance
NC-2009 SSc3:Brownfield redevelopmentposted by UO Design and Construction on
We always conduct asbestos surveys (assessments) in accordance with the LRAPA regulations Title 43.
IEQ c4.3 Flooring
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Rezkar Abdulmajeed on
We have a project with some floor areas designed to be ceramic and quarry tiles. Can someone advise if the two above need to meet floorscore standrads. your comments are appreciated
Multiple indentical RTUs combined with plenum ducts
NC-v4 EQp1:Minimum indoor air quality performanceposted by Chanyang Shin on
Multiple identical RTUs combined with plenum ducts serve a whole building. How can I prepare 62.1 MZcal? Can I add up cfm of all RTUs and assume it like one system using one sheet?
Application Guide for Campuses and Multiple Buildings
posted by Jeff Smitley on
Is there an Application Guide for Campuses and Multiple Buildings that can be used for LEED v4 BD+C: Schools?
Regularily Occupied or not?
NC-2009 IEQc8.2:Daylight and views - viewsposted by Alex Barrera on
I'm working on an industrial building in Virginia. One of the rooms is a Quiet/Sleep room, where employees can rest in between their shifts.
material streams
CI-v4 MRc6:Construction and demolition waste managementposted by Sean Quinn on
We are working on a project where there is not enough room for on-site separation, and the commingled waste will be picked up by the sorting facility.
"DES Energy Cost" Thread Follow-Up
NC-2009 EAc1:Optimize energy performanceposted by Joseph Chappell on
In a previous post titled "DES Energy Cost" dating back to May 13, 2013, my interpretation of the responses in the thread is that a project can choose to either follow 90.1 or the DES Guidance from
Apparatus bay of Fire Department
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Laura Charlier on
HI there, Would the apparatus bay of a fire department need to be included in the building flush-out? I see a typical garage would not need to be included but this isn't a typical garage.