Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Energy Recovery Bypass

NC-2009 EAp2:Minimum Energy Performance
posted by  Kalyan Nishtala  on 

Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.

0

Solar Tubes in Energy Pro

NC-2009 EAp2:Minimum Energy Performance
posted by  Logan Dorrell  on 

How would we model a solar tube light fixture in Energy Pro Software? We want to get the light thru it, but not the heat.

1
Thu Oct 1, 2015, 4:43 pm
1
Wed Feb 1, 2017, 11:51 pm

Independent Waste Stream Auditor Needed

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Michelle Bracewell-Musson  on 

My project is in Fresno, California, and we are in need of a company that can perform this type of audit for our medium sized Manufacturing Facility.

1
Mon Sep 22, 2014, 4:19 pm

Very high density in a rapidly developing area

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Susan Di Giulio  on 

Hi, Our project is a campus filling a city block across the street from the premier sports stadium, a huge entertainment complex and a convention center in major US city.

1
Sat Jan 23, 2016, 12:11 am

Temporary potable connection to a permanent irrigation system

Schools-2009 WEc1:Water Efficient Landscaping
posted by  Bradley Smith  on 

I have a LEED Campus project, using permanent irrigation systems fed by rainwater collected in cisterns and pumped. Approx.

1
Sun Aug 27, 2017, 12:48 am

initial cost for lease

CI-2009 EAc3:Measurement and Verification
posted by  Monica Hue  on 

Is there are is an initial fee that must be paid upfront when the tenant signs the lease to pay for energy use? If there is this fee, how much does that typically cost?

1
Fri Nov 28, 2014, 9:42 pm

Cold Climate

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Erin Holdenried  on 

Does anybody have experience using an alternate compliance path for a project in a cold climate?

1
Fri Aug 12, 2016, 11:35 pm

Required to use facility weighted average?

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Eileen Gohr  on 

"Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials to the facility." Does this mean that proje

0

Parking Area Clarification

General forums
posted by  Kristy O'Hagan  on 

In the latest Update to LEED Interpretation (LI) 10079 & 10080, the 75% maximum limit on area devoted to vehicle storage & circulation has been removed. As of October 1, 2012: So as not to

0