Energy Recovery Bypass
NC-2009 EAp2:Minimum Energy Performanceposted by Kalyan Nishtala on
Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.
Solar Tubes in Energy Pro
NC-2009 EAp2:Minimum Energy Performanceposted by Logan Dorrell on
How would we model a solar tube light fixture in Energy Pro Software? We want to get the light thru it, but not the heat.
Upload Documentation
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Patrick Stark on
I am doing option 3, approach 1.
Independent Waste Stream Auditor Needed
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Michelle Bracewell-Musson on
My project is in Fresno, California, and we are in need of a company that can perform this type of audit for our medium sized Manufacturing Facility.
Very high density in a rapidly developing area
NC-2009 SSc2:Development Density and Community Connectivityposted by Susan Di Giulio on
Hi, Our project is a campus filling a city block across the street from the premier sports stadium, a huge entertainment complex and a convention center in major US city.
Temporary potable connection to a permanent irrigation system
Schools-2009 WEc1:Water Efficient Landscapingposted by Bradley Smith on
I have a LEED Campus project, using permanent irrigation systems fed by rainwater collected in cisterns and pumped. Approx.
initial cost for lease
CI-2009 EAc3:Measurement and Verificationposted by Monica Hue on
Is there are is an initial fee that must be paid upfront when the tenant signs the lease to pay for energy use? If there is this fee, how much does that typically cost?
Cold Climate
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Erin Holdenried on
Does anybody have experience using an alternate compliance path for a project in a cold climate?
Required to use facility weighted average?
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Eileen Gohr on
"Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials to the facility." Does this mean that proje
Parking Area Clarification
posted by Kristy O'Hagan on
In the latest Update to LEED Interpretation (LI) 10079 & 10080, the 75% maximum limit on area devoted to vehicle storage & circulation has been removed. As of October 1, 2012: So as not to