LEED HC (major renovation) or CI (v4)?
posted by Heather Zeto on
I have a project that is undergoing discussion regarding which rating system to use. For all practical purposes, it is an interior fit-out of 4 floors of a hospital tower for a new unit.
Manufacturer Declaration Letter
NC-2009 MRc4:Recycled Contentposted by Rezkar Abdulmajeed on
We completed the design of our project in 2013 and start construction in 2014.
Can CARB’s ATCM 93120 (2008).
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Summer Gorder on
Can CARB ULEF (Ultra Low Emitting) composite wood ceiling tiles that meet ATCM 93120 (2008) comply with IEQ credit 4.4?
Planters
NC-v4 SSc3:Open spaceposted by Justin Halse on
Under LEED v4, do planters count as vegetated space? We are working on a project for a university and we are putting in planters.
Walking path question
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Chris Miller on
Can our walking path that leads to the bus stops go through the buildings parking lot?
Adhesive- expansion joints
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Stephanie Santiago on
Quick question on how to classify epoxy adhesive for expansion joints: The product data from the vendor, Emseal, states the VOC is 100 g/l, now which VOC limit do I use since these joints will be
Functional entryway of project
CS-v4 LTc5:Access to quality transitposted by Martin Stowell on
For this credit, 'functional entry of the project' means from the project boundary or the actual building?
Herbicides and Pesticides used during performance period
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Joseph Snider on
I am a bit confused about the use of herbicides and fertilizers for landscaped areas within the LEED boundary.
Separate Storage Enclosure
NC-2009 PIf2:Project Summary Detailsposted by David Hryvniak on
I am working on a project that has a small, separate generator enclosure/ maintenance building. It is not connected to the building, and it is not conditioned or ventilated.
NC-v4: Rainwater management
NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project? The initial pond will be des