Customer Use of Restrooms
Retail-CI-v4 WEc1:Indoor water use reductionposted by Donny Goris-Kolb on
Guidance states "If restrooms are not provided for customers within the retail project,.." If the store's restrooms are intended for employee use, but employees are directed to grant customers acce
Document Upload
NC-v4 EQc6:Interior lightingposted by Boggarm Setty on
For V4, is there no requirement anymore to upload supporting documents? I don't see any upload buttons on the form itself.
Use of Hycrete waterproofing admixture for Innovation credit
NC-2009 IDc1:Innovation in Designposted by Donna Juselis on
Our project is a mixed use redevelopment in a flood prone area. The first floor slab-on-grade on the project is located below the design flood elevation.
LEED O&M for building additions
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Steve Gross on
I am in the process of documenting LEED O&M credits for a museum that is building an addition.
Addition To An Existing Certified Building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Timothy VanOudenhoven on
I am currently working on a project where an existing certified building will have major renovation to the interior of the existing and an addition added to the existing certified building. There w
LEED Selection - High Rise Residential
posted by Curt Pascoe on
I am working on a unique project. 30 story existing historic building, office.
Detention Center Perimeter and Recreation Yard Security Lighting
NC-2009 SSc8:Light Pollution Reductionposted by Dranan Sparks on
I have a state owned youth detention center (jail) project in lighting zone LZ1.
Master site credits
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by charles bell on
We have three projects on a campus application. The master site submittal for this credit as well as others was approved during review.
Final Report
NC-v4 EAc1:Enhanced commissioningposted by Colin Grist on
Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin
93727 On-site & Off-site Ren. En. - RP for 6 Points if only Off?
EBOM-2009 RPc1:Regional Priorityposted by Michelle Bracewell-Musson on
Hello, I know that a project can only earn Exemplary if 100% is off-set, however, it must be a COMBINATION of On-site and Off-site to earn EP.