Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Building Flush - Filter Change?

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Brianne Smith  on 

Our project is pursuing Option 1 Path 2 - Flush During Early Occupancy. Do filters need to be replaced after the flush, or only after construction as part of IEQc3.1?

1
Tue Apr 5, 2016, 5:12 pm

Residents excluded?

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Miranda Lescaze  on 

A portion of our building is office space and a portion is multi-family senior residences.

1
Thu Mar 10, 2016, 12:46 am

What are the baseline conditions?

EBOM-v4 SSc5:Site management
posted by  Zachary Hayes  on 

This says we have to reduce from the baseline, which I assume is our initial reported use. However, if this is the case how can there be any reduction?

0

Conflict of interest?

NC-v4 EQc4:Indoor air quality assessment
posted by  emily reese moody  on 

Are there any conflict of interest concerns if a contractor hires the air testing company versus the owner or A/E?

1
Thu Aug 17, 2017, 11:22 pm

Equipment Baseline

Pilot-Credits EApc3:Medical and process equipment efficiency
posted by  LUCY WILLIAMS  on 

Our team is considering pursuing this credit, but it is unclear what baseline the specified equipment is to be measured against.

1
Mon Mar 15, 2021, 10:04 pm

Daylight Measurements disappointing

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Joyce Kelly  on 

1.Measurements were disappointing July 15 because shading structures are doing their job and blocking direct sunlight - a blessing in Southern Arizona. Should we wait until the nx.

1
Fri Aug 14, 2015, 12:50 pm

Concrete coating

CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Katie Diedrich  on 

Currently working on a job which is under Commercial Interiors v2009. There is an existing concrete floor which is going to be sealed. Which coating type would this need to be classified as?

1
Thu Nov 17, 2016, 6:39 pm

Previously Submitted Documentation

CI-2009 PIf5:Previously LEED Certified Details
posted by  CHRISTIAN LUTJEN  on 

Hello, we are embarking on a new LEED 2009 C.I. project in a building that has already achieved a LEED Gold rating for Core and Shell.

1
Tue Dec 29, 2015, 5:22 pm

Prefinished wood flooring

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Brianna Brandsen  on 

when installing prefinished wood flooring in a building that is attempting LEED certification, does the finish need to be compliant with LEED regulations, as you are not applying the finish on site

1
Fri Feb 10, 2017, 7:02 pm

FTE Consistency Pertaining to IEQp1

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Spencer Eldredge  on 

The need to keep FTEs consistent through all credits is stressed though in the case of IEQp1 where for Mechanical Ventilation, table IEQp1-3, for code compliance based on square footage, the Pz (zo

1
Mon Sep 29, 2014, 8:17 pm