Is the requirement 10fc or 25fc for simulation?

Schools-2009 IEQc8.1:Daylight and Views—Daylight
posted by  James Geers  on 

The printed material states that the simulation threshold is 25fc but LEEDuser states there is a 10fc threshhold. Has this been revised?

1
Sat Nov 8, 2014, 1:21 am

Re-using existing building as outdoor amphitheater

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Jeff Denno  on 

Hello, We are working on a New Construction project where they plan to keep 25% of the existing brick wall from the existing building in-tact for an outdoor amphitheater that is not attached to th

1
Sat Aug 26, 2017, 12:01 pm

Pre-Owned furniture

CI-2009 MRc4:Recycled Content
posted by  Susan Di Giulio  on 

If a project is using less than 30% of the furniture budget's worth of pre-owned furniture, and thus not attempting MRc3.2, can that be used towards MRc4 instead?

1
Sat Feb 7, 2015, 2:56 pm

ACP / developer control percentage penalizes existing buildings?

CS-2009 EAp2:Minimum Energy Performance
posted by  Jareb Ketay  on 

I've done a number of Core and Shell models before, and always use the ACP calculator.

1
Thu Jun 9, 2016, 2:40 pm

LEED BD+C NC or LEED ID+C: CI

LEED Rating System Selection
posted by  Pournamasi Rath  on 

Hi, I am looking for guidance on the appropriate LEED rating system for my project. This project has 2 buildings - one is NC and the other is renovation of an existing building.

1
Sat Aug 26, 2017, 7:47 pm

aerosol line saver (also posted in IEQc4.1)

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Lyle Axelarris  on 

I also posted this in IEQc4.1 since I do not know where, if anywhere, this product would go: Has anyone considered reporting the use of aerosol "line saver"?

1
Wed Apr 15, 2015, 3:44 am

Non-LEED-Certifiable Buildings on Site

CS-2009 MPR3:Must use a reasonable site boundary
posted by  Krissy Buck Flickinger  on 

Hello everyone- I have basically two questions in one, regarding how to treat additional buildings on your site. Project Background: I have an 880,000 SF site.

0

Meter for Water Use in Laundry

Healthcare-v2009 WEc2:Water use reduction - measurement and verification
posted by  Jon Penndorf  on 

Does the requirement to meter water used for laundry apply to all type of laundry equipment. For example would is apply to a residential type washing machine or only commercial grade? Thanks

0

IEQc8.1 Core and Shell credit with no tenant fit out

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Shelly Christman   on 

We are in a design build arrangement with an architect and owner to construct an office building with no planned tenant fit out at this time.

1
Thu Mar 23, 2017, 2:17 pm

Hand Hygiene - Towel Dispensers

EBOM-2009 IEQp3:Green Cleaning Policy
posted by  Jeannie Rueter  on 

USGBC has a Green Cleaning Policy template in the Resources section of the Credit Library.

1
Fri Jan 20, 2017, 11:31 pm