RCI CORR Information

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  John Danby  on 

I have found that it takes a bit of work to actually see that a facility has achieved the Recycling Certification Institute's CORR certification.

0

Classification of PVC adhesive and Primer

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Randy Weatherly  on 

I have classified PVC water pipe glue as "PVC Welding Adhesives" and the Purple PVC primer as "Adhesive Primer for Plastic". Is this correct"

1
Mon Jun 27, 2016, 12:56 pm

Compliance for Existing Site Features

Pilot-Credits PC14:Walkable Streets
posted by  Vicki Rybl  on 

I am working on a project where most of the site hardscape is existing. I'm looking for an opinion specifically on two of the requirements for this credit. 7.

0

Showerhead with multiple settings

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  AtSite Inc  on 

To receive all of the WEc2 points available, our project needs to install 1.0 gpm shower heads.

1
Wed Dec 21, 2016, 11:49 pm

Future Pedestrian Access

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Rachel Weber  on 

We have a project that will meet SS2 once pedestrian access is available. Do you know if it is adequate to show the sidewalk is in the county's budget?

1
Fri Nov 27, 2015, 3:32 am

Preproject water bodies

ND-Plan-v4 SLLp3:Wetlands and water body conservation
posted by  Sarah Kearney  on 

Hello, What does 'preproject' really mean? Our project is located near a river. Currently there is one building with docks within 50 ft. of the water.

1
Tue Feb 28, 2017, 5:16 pm

Off-Site Solar Used to Power 100% of Building Electricity

CS-2009 EAc6:Green Power
posted by  Heather South  on 

I am working on a LEED CS 2009 project and the owner of the building is building an off-site solar farm in a different town in the same state as the building he also owns and is going to be buildin

1
Fri Aug 21, 2015, 2:18 pm

Are basement walls included in envelope calculations

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Stacey Olson  on 

I understand the floor slab of basements is allowed to be included; what about the envelope?

1
Wed Jan 18, 2017, 12:00 am

OA Air Flow Monitoring in Laundry

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Joe Kaminski  on 

The project I am working on has large laundry area with outside air provided for makeup air for the dryer exhaust.

1
Wed Dec 9, 2015, 3:20 pm

Senior Care/Assisted Living Facilities

NC-2009 EAp2:Minimum Energy Performance
posted by  Carrie Webster  on 

Is anyone aware of exemptions or opportunities to take additional credit for senior care/assisted living facilities?

1
Thu Feb 18, 2016, 3:24 pm