Forum quick links
right of ways adjacent to project?
ND-Plan-v4 NPDc7:Transit facilitiesposted by Ian Scott on
Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with tran
car wash by hand (manual car wash) at a car dealership
CI-v4 WEp1:Indoor water use reductionposted by Kristen Magnuson on
Community, I am assuming we are safe to exclude a sink being used for a manual car washing station (hand-wash carwash) at a car dealership.
"Special Conditions" for baseline
NC-2009 WEc1:Water Efficient Landscapingposted by Ralph Bicknese on
For our current project, virtually 100% of landscaping is turfgrass using 62.5% efficient rotors, usually a difficult combination for achieving 50% reduction.
Regularly Occupied Inspection Bay with Garage Roll-Up Doors
NC-v4 EQc7:Daylightposted by Kristen Magnuson on
Daylighting Community, We are working on a small building located on an airport campus called a Ground Transportation Unit (GTU).
Bird Collision Deterrence: Summary of Material Threat Factors
Pilot-Credits SSpc55:Bird collision deterrenceposted by Alysa Hoffmeister on
What is the process to have additional materials submitted, approved and added to the Bird Collision Deterrence: Summary of Material Threat Factors document?
Trane TRACE's 40 plant limit.
Schools-2009 EAp2:Minimum Energy Performanceposted by Kelsey Rightmer on
The school I am modeling has a vrf system served by dedicated outdoor air energy recovery units as well as packaged rooftop units.
Exterior doors in meeting rooms
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Jeannie Rueter on
The conference center I'm working on has several small meeting rooms that have interior and exterior doors with the exterior doors leading to open public terraces.
Canopy to building with wall opening (is it a "complete bldg")?
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Lee on
We have a project that is an existing canopy converted into a building without a 15' wide wall on one side. There will be a 10'x15' enclosed office inside this building.
feedback
Pilot-Credits EApc65:Monitoring based commissioningposted by emily reese moody on
There was some confusion at the on start of the process as to who owned the analyzing and reporting of the data.
Elementary School
NC-v4 EAp2:Minimum energy performanceposted by K Nakamura on
Is there any special considerations for a project registered (v2.2) and designed 10 years ago is now being constructed. V2.2 and v2009 have expired so we need to register it for v4.