Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by John Danby on
I have found that it takes a bit of work to actually see that a facility has achieved the Recycling Certification Institute's CORR certification.
Classification of PVC adhesive and Primer
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Randy Weatherly on
I have classified PVC water pipe glue as "PVC Welding Adhesives" and the Purple PVC primer as "Adhesive Primer for Plastic". Is this correct"
Compliance for Existing Site Features
Pilot-Credits PC14:Walkable Streetsposted by Vicki Rybl on
I am working on a project where most of the site hardscape is existing. I'm looking for an opinion specifically on two of the requirements for this credit. 7.
Showerhead with multiple settings
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by AtSite Inc on
To receive all of the WEc2 points available, our project needs to install 1.0 gpm shower heads.
Future Pedestrian Access
NC-2009 SSc2:Development Density and Community Connectivityposted by Rachel Weber on
We have a project that will meet SS2 once pedestrian access is available. Do you know if it is adequate to show the sidewalk is in the county's budget?
Preproject water bodies
ND-Plan-v4 SLLp3:Wetlands and water body conservationposted by Sarah Kearney on
Hello, What does 'preproject' really mean? Our project is located near a river. Currently there is one building with docks within 50 ft. of the water.
Off-Site Solar Used to Power 100% of Building Electricity
CS-2009 EAc6:Green Powerposted by Heather South on
I am working on a LEED CS 2009 project and the owner of the building is building an off-site solar farm in a different town in the same state as the building he also owns and is going to be buildin
Are basement walls included in envelope calculations
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Stacey Olson on
I understand the floor slab of basements is allowed to be included; what about the envelope?
OA Air Flow Monitoring in Laundry
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Joe Kaminski on
The project I am working on has large laundry area with outside air provided for makeup air for the dryer exhaust.
Senior Care/Assisted Living Facilities
NC-2009 EAp2:Minimum Energy Performanceposted by Carrie Webster on
Is anyone aware of exemptions or opportunities to take additional credit for senior care/assisted living facilities?