Forum quick links
University Housing
Schools-NC-v4 LTc5:Access to quality transitposted by Sean Adams on
We are doing a university housing project and have been basing it off of the BD+C New Construction but for this section if we are able to do it under School-NC we would be able to get the 4 points
Pilot Credit - Forum Participation
Pilot-Credits IPpc101:Integrative Processposted by Greg Romanczyk on
As part of the requirements for this pilot credit, we are noting our participation in the Forum. One of the questions listed asks about the number of meetings (i.e.
SSc2 Soil testing for existing soils only?
NC-v4 SSc2:Site development - protect or restore habitatposted by Sue Bryant on
Samples to be tested must be taken from soils that are disturbed and will be revegetated. Restored soil must meet existing soil attributes.
Airflow monitor alarms
NC-v4 EQp1:Minimum indoor air quality performanceposted by Nancy Henderson on
We have several single zone RTU's that will need direct airflow monitors because the units have DCV. The contractor says the low OA alarm will be located on the units at the roof. They
Fire Station minimum parking?
NC-v4 LTc7:Reduced parking footprintposted by Erin Holdenried on
Looking for suggestions on how to determine the parking ratio for a Fire Station. There doesn't seem to be any use within the Base Ratios Table that align with a Fire Station.
DES Cooling tower
EBOM-v4 WEc3:Cooling tower water useposted by Elyse Dufrene on
Can DES cooling tower serving the project be used to demonstrate water consumption reduction for cooling tower water use credit?
Views for Medical Exam Rooms
NC-v4 EQc8:Quality viewsposted by Kyle Ritchie on
Our project is pursuing LEED v4 BD+C certification and is a University building.
Earthquake preparedness
Pilot-Credits IPpc99:Design for Enhanced Resilienceposted by Andrew Ondersma on
Our project pursued this pilot for Earthquake specific design measures.
Environmental noise impacts constantly evolving
Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise controlposted by Andrew Ondersma on
For this credit our project had a unique challenge in that many adjacent city blocks were also under construction meaning that the environmental noise impacts to our site would be constan
Preferred parking/ Charging stations allocated off - site
NC-v4 LTc8:Green vehiclesposted by on
We have a project on a university campus that will have no new parking associated with the project. However, the design team is hoping to achieve points for LTc8.