Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Facade Role in LEED certification

Green Globes Discussion Forum
posted by  Leonardo Flores  on 

Hi LEEDusers.. I am new here and would like to hear any of your feedback on below. I understand that the facade or building envelope/enclosure of a building plays a role on EA and MR.

0

Management Plan Addressing How Pollution and Eutrophication of Waterways Would Be Minimized through Operational Changes

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Sandra Lester  on 

We have been asked by the CaGBC to provide a management plan addressing how pollution and eutrophication of waterways would be minimized through operational changes.

0

How to know when is the right time to submit for design review?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Lauren Leatherbarrow  on 

The project is about to start (after the COVID-19) lockdown and so money is tight - so how long can we wait to submit for design review?  This is my first LEED project how do I know when

2
Sustainable Consultant
INSPEC Sustainability Group LLC
LEEDuser Premium Member
43 thumbs up
Sun Jun 7, 2020, 7:19 pm

Required percentage of vegetated area.

CS-v4 SSc3:Open space
posted by  Susan Di Giulio  on 

I have attended numerous seminars, including an all-day workshop at GreenBuild, on V4 and V4.1, and every time I was told that for this credit, the minimum required vegetated area is 25% of the 30%

3
Default Avatar
VP of Innovation
SIG
LEEDuser Basic Member
2 thumbs up
Thu Jun 4, 2020, 6:07 pm

Do not have LEED AP yet, but colleague does

NC-2009 IDc2:LEED Accredited Professional
posted by  Edgar Arevalo  on 

I have been trying to find time to take the LEED AP exam but other projects that I'm a part of have been taking up my time that it makes it difficult to study now.  However, my colleague who i

3
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Wed Jun 3, 2020, 5:03 pm

Meters for every floor? One Tenant Building

CI-v4.1 EAc3:Advanced Energy Metering
posted by  Susan Di Giulio  on 

In our CI Project, we have a single Tenant.  Per this credit, is a meter required for every floor of this 8 floor building?  We believe that is not required for this CI project.

1
Tue Jun 2, 2020, 12:40 pm

Short and Long Term Together?

NC-v4 LTc6:Bicycle facilities
posted by  Summer Minchew  on 

Can short and long term spaces be located together as long as all other requirements are met? 

1
Mon Jul 6, 2020, 2:29 pm

Bipolar Ionization devices; documenting reduced outside air quantities

Schools-NC-v4 EQp1:Minimum indoor air quality performance
posted by  Kent B   on 

I have a new school project which currently has ionization devices throughout the HVAC RTUs.  These ionization devices reduce the required outside air.

0

IES thermal block and baseline model with system 6

NC-v4 EAc2:Optimize energy performance
posted by  Ying Lindsey  on 

Dear all, 
I need your professional opinion about a project that I am currently working on.

6
Thu May 28, 2020, 9:41 pm

Partial Compliance Requirement for Insulation Category

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Marcia Weekes  on 

For the insulation category, the credit language indicates that "At least 75% of all insulation, meets the VOC emissions evaluation." However, there is no further information to indic

4
President
Green Sage Consulting LLC
LEEDuser Premium Member
8 thumbs up
Wed May 27, 2020, 11:42 pm