Forum quick links
Minimun Energy Performance
CI-2009 EAp2:Minimum Energy Performanceposted by sebastian castañeda on
Greetings from Peru I am a student of which I would like to know what to do in the case of minimum energy performance of a commercial interiors when you start from scratch and there is no informat
Existing Building Commissioning
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by sebastian castañeda on
Hello. I am a student who is interested in learning about the methodology of LEED certification and there are some points that I do not clear.
Water Heater efficiency per table 7.8 of ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by Billy Condor on
Hello, As required by 7.4.2 Equipment Efficiency of ASHRAE 90.1-2007, for a water heater less than 12 kW and more that 20 gal, the required performance is EF=0.97-0.00132*V. My question is: is ther
Scope in a C&S shopping mall
CS-2009 EAp2:Minimum Energy Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating.
Inconsistent Price Square Meters versus Square Feet
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Ben Stanley on
We're pursuing this pilot credit for an EBOM project and it looks like the stated price for financial support is inconsistent if your reporting site area in square meters ($0.5 /square meter) versu
Withered grass
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Gustavo De las Heras Izquierdo on
Our client has planted a mixture of grass species in a vegetated area. Some of the species have withered and only one has remained and keeps growing.
Lavatories in special conditions
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Vanessa Montezuma Ramos on
Hello everyone! I am currently working on a project for a university campus. This is a three story building, with laboratories for students and researchers.
Scope of the Pre-requisite in C&S Shopping mall
CS-2009 IEQp1:Minimum IAQ Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.
supplier and products UF
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Jose Antonio Kovacevic on
To comply with IEQc4.4 credit in LEED NC It has been evaluated local furniture suppliers of MDF, used for new buildings and the most regular composite woord and agrifiber for new buildings. In Peru
source of air for mechanical Ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Alan Viale on
We have a project that is natural ventilated in perimeter spaces (circulations and cafe dining rooms), and It is mechanical ventilated in core spaces (meeting rooms and cafe dining room) that is pu