Forum quick links
Interpretation Problem
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Maria Isabel Conde on
We have a problem with the interpretation of the information necessary to apply for this credit.
Equipment not list on CPG
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Maria Isabel Conde on
Our project has a WSHP bigger than 135000 btu/h. According to CPG table 2.9.2 the efficiency required for WSHP up to 135000 btu/h is 14 EER and the WSHP of our project has a 14.1 EER.
Calculation based on chilled water meters
Retail-CI-v2009 EAc5:On-site renewable energyposted by Maria Isabel Conde on
Our comercial interior project is located in a building that has photovoltaic panels that feed the central chilled water plant. We have: 1.
CS project without bathrooms and elegible fixtures
CS-2009 WEp1:Water Use Reductionposted by Maria Isabel Conde on
We´re working in a CS building without plumbing fixtures. How we can document the WEp1?. We need to make the Tenant Lease agreement?, How we can earn points in WEc3?.
Natural ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gaston Michaud on
We are working on a residential core and shell project, and we are having some issues with the compliance of ASHRAE 62-1 ventilation requirements. Basically, the building has apartments on each lon