Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Interpretation Problem

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Maria Isabel Conde  on 

We have a problem with the interpretation of the information necessary to apply for this credit.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jul 12, 2016, 6:45 pm

Equipment not list on CPG

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Maria Isabel Conde  on 

Our project has a WSHP bigger than 135000 btu/h. According to CPG table 2.9.2 the efficiency required for WSHP up to 135000 btu/h is 14 EER and the WSHP of our project has a 14.1 EER.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jul 5, 2016, 4:23 pm

Calculation based on chilled water meters

Retail-CI-v2009 EAc5:On-site renewable energy
posted by  Maria Isabel Conde  on 

Our comercial interior project is located in a building that has photovoltaic panels that feed the central chilled water plant. We have: 1.

5
Tue Apr 26, 2016, 12:00 am

CS project without bathrooms and elegible fixtures

CS-2009 WEp1:Water Use Reduction
posted by  Maria Isabel Conde  on 

We´re working in a CS building without plumbing fixtures. How we can document the WEp1?. We need to make the Tenant Lease agreement?, How we can earn points in WEc3?.

2
Mon Nov 30, 2015, 11:09 pm

Natural ventilation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gaston Michaud  on 

We are working on a residential core and shell project, and we are having some issues with the compliance of ASHRAE 62-1 ventilation requirements. Basically, the building has apartments on each lon

2
Default Avatar
Ecology and Environment, Inc.
LEEDuser Basic Member
16 thumbs up
Thu Oct 2, 2014, 8:30 pm