LEED Form MR 4
NC-2009 MRc4:Recycled Contentposted by juan pena on
The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?
Parking space ownership
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Gustavo De las Heras Izquierdo on
I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual owners?
Waste generated by mobile offices within the project
NC-2009 MRc2:Construction Waste Managementposted by Tonatiuh Valencia on
what happens to the waste generated in the temporary offices within the project, are inorganic and organic waste.
Rainfall over landscape areas
EBOM-2009 WEc3:Water Efficient Landscapingposted by Rubén M. R. on
Would it be valid to claim 50% potable water reduction for irrigation if I have a landscape area that requires X galons of irrigation during the month of July (according to the LEED form) and I can
LEED Lab Mexico
Pilot-Credits IPpc96:LEED Labposted by David Dominguez on
We are wrapping up our second semester and finishing our performance period, we expect soon to have the first building in Mexico certified under a LEED-Lab.
Alternative Compliance Path
CS-2009 EAc1:Optimize Energy Performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if the
Exterior space, partially enclosed - Application of Std.
NC-2009 IEQp1:Minimum IAQ Performanceposted by Mauricio Ramirez on
Hello in a Museum, we have an uderground open space, that, on our understanding is an exterior space, as it is outside the Access vestibule.
Building Footprint
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Alejandro Macias on
For the calculation of the building footprint, if the project is located in a Previously developed area .Which area of the building footprint should I use?
Medical Equipment Specification
Healthcare-v4 WEp2:Indoor water use reductionposted by Gabriela Crespo on
Dear all, We're working on a HC project in Mexico, but we seem to be having trouble complying with what is required for process equipment in table 5 of this pre-req.
Automatic Receptacle Control
CI-v4 EAp2:Minimum energy performanceposted by Gabriela Mena on
Hi, We have a CI project in Mexico City, for the receptacle control we are specifying 50%of private and open offices with a timer.