LEED Form MR 4

NC-2009 MRc4:Recycled Content
posted by  juan pena  on 

The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?

1
Sat Aug 26, 2017, 5:34 pm

Parking space ownership

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Gustavo De las Heras Izquierdo  on 

I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual owners?

1
Thu Mar 26, 2015, 1:10 am

Waste generated by mobile offices within the project

NC-2009 MRc2:Construction Waste Management
posted by  Tonatiuh Valencia  on 

what happens to the waste generated in the temporary offices within the project, are inorganic and organic waste.

1
Tue Dec 15, 2015, 4:31 pm

Rainfall over landscape areas

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Rubén M. R.  on 

Would it be valid to claim 50% potable water reduction for irrigation if I have a landscape area that requires X galons of irrigation during the month of July (according to the LEED form) and I can

1
Wed Apr 6, 2016, 10:58 pm

LEED Lab Mexico

Pilot-Credits IPpc96:LEED Lab
posted by  David Dominguez  on 

We are wrapping up our second semester and finishing our performance period, we expect soon to have the first building in Mexico certified under a LEED-Lab.

0

Alternative Compliance Path

CS-2009 EAc1:Optimize Energy Performance
posted by  Gabriela Mena   on 

Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if the

1
Thu Jun 1, 2017, 6:35 pm

Exterior space, partially enclosed - Application of Std.

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Mauricio Ramirez  on 

Hello in a Museum, we have an uderground open space, that, on our understanding is an exterior space, as it is outside the Access vestibule.

1
Mon Jul 6, 2015, 10:20 pm

Building Footprint

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Alejandro Macias  on 

For the calculation of the building footprint, if the project is located in a Previously developed area .Which area of the building footprint should I use?

1
Thu Jan 28, 2016, 7:33 pm

Medical Equipment Specification

Healthcare-v4 WEp2:Indoor water use reduction
posted by  Gabriela Crespo  on 

Dear all, We're working on a HC project in Mexico, but we seem to be having trouble complying with what is required for process equipment in table 5 of this pre-req.

0

Automatic Receptacle Control

CI-v4 EAp2:Minimum energy performance
posted by  Gabriela Mena   on 

Hi, We have a CI project in Mexico City, for the receptacle control we are specifying 50%of private and open offices with a timer.

1
Tue Jun 20, 2017, 1:25 pm