Forum quick links
LEED O&M on a portion of a building
EBOM-v4 MPR3:Must comply with project size requirementsposted by LEED Pro Consultant on
Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification?
Path 10
CI-2009 SSc1:Site Selectionposted by Rodrigo Gomez Junco on
We are pursuing SSc1 Option 2 Path 10 for a CI project within a CS registered building. My question is, do I need the Tenant Lease Agreement from the CS project in order to document this credit?
Frequency of rides per day that have to be given by the shuttle
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Jorge Lopez de Obeso on
We are working on a project in which the nearest bus stop is just over a quarter mile so it is proposed to provide a shuttle service to take users to the bus stop.
Energy model
CS-2009 EAp2:Minimum Energy Performanceposted by gabriel Morales on
Is it possible to model the building on Energy Plus and the underground parking lot calculation do it by extraordinary calculations? Also if it is a mixed use building, is it possible to model the
Local food production
Pilot-Credits SSpc82:Local food productionposted by Lourdes Salinas on
What is the best option of water irrigation systems for a small on site food production?
SRI Non-roof
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by MARIA ESTHER LAMADRID on
Hello, does anyone know if it is aceptable to use sri values of concrete from the guide for a crusher fine concrete or it need a test to be accepted? Thanks
In the prelimary review
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by jorge calderon on
In the prelimary review comments to achieve this credit we recive the next comment: "Provide supplemental calculations confirming that sufficient shower facilities have been provided to serve all F
Urinals on residencial
NC-2009 WEc3:Water Use Reductionposted by Alejandro Macias on
I m working on a dormitory for kids.
SR Natural stone
NC-v4 SSc5:Heat island reductionposted by Juan Carlos Contreras on
Hello, About the option 1 Nonroof and Roof, we are using a natural Stone (local material), Off-White color, for the pavement in the main square and walkway.
Belated Project Registration / Certification Process Feedback
posted by Daniela Mendez on
Our project is a possible CS, comprised of office, residential and commercial spaces located in Mexico City.